1504249857
The Uptime Wind Energy Podcast

Advertise on podcast: The Uptime Wind Energy Podcast

Rating
★★★★★
4.8
from
41 reviews
This podcast has
290 episodes
Language
English
Date created
2020/03/24
Latest episode
2026/04/23
Average duration
22 min.
Release period
3 days

Description

Uptime is a renewable energy podcast focused on wind energy and energy storage technologies. Experts Allen Hall, Rosemary Barnes, Yolanda Padron, and Matthew Stead break down the latest research, tech, and policy.

Unlock The Uptime Wind Energy Podcast podcast Email contact info,
Listeners & Audience details

Email contact information

Direct podcast contact details

Listeners

Audience numbers & engagement insights

Audience details

Podcast Insights

Podcast episodes

Check latest episodes from The Uptime Wind Energy Podcast podcast


PowerCurve’s Innovative Vortex Generators and Serrations
2026/04/23
Nicholas Gaudern from PowerCurve joins to discuss SilentEdge serrations with up to 5 dB noise reduction, Dragon Scale VGs for AEP recovery, and their approach to products that actually perform in the field. Contact PowerCurve on LinkedIn for more information. Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us! Welcome to Uptime Spotlight, shining Light on Wind. Energy’s brightest innovators. This is the Progress Powering tomorrow. Allen Hall: Nicholas, welcome back to the show.  Nicholas Gaudern: Thanks, Allen. Always a pleasure.  Allen Hall: Well, there’s a lot of new products coming outta PowerCurve. And PowerCurve is the aerodynamic leader in add-ons and making your turbines perform at higher efficiency with less loss. Uh, so basically taking that standard OEM blade and making it work the way it was intended to work. Nicholas Gaudern: Yes. We  Allen Hall: like to  Nicholas Gaudern: think so. Yeah.  Allen Hall: And there’s a, there’s a lot of new technology that you’ve been working on in the lab that you haven’t been able to explore to the, introduce to the world, so to speak. Yeah. And we’ve seen some of it from the inside of, you know, you’re working behind the scenes or working really hard to get this done, but now that technology has been released to the world, and we’re gonna introduce it today, some new trailing edge. [00:01:00] Components. Yeah. That really, really reduce the noise. But they, they look a little bit odd. Yes. There’s a lot of ADON dams going on with  Nicholas Gaudern: Yeah.  Allen Hall: With these. So what, what do you call these new trailing edge parts?  Nicholas Gaudern: So, so what you have in your hand here? This is the Silence edge, uh, serration. So this is our new trailing Edge Serration products. Now, most people, when they think of training restorations, they are thinking of triangles.  Allen Hall: Exactly.  Nicholas Gaudern: These Dino tails. Dino Tails, that’s the Siemens, Siemens name for them. Pretty, pretty standard. You see ’em on a lot of turbines now. Sure. And they work, you know, they do do a job. They do a job. They reduce noise. But like with lots of things in, in aerodynamics, there’s lots of different ways that you can solve a problem and some are better than others. So we’ve worked for a long, long time in the wind tunnel, uh, in the CFD simulations, and we’ve come up with this pretty unique shape. We think,  Allen Hall: well, the, the, the shape is unique and if you, if you look at it, there’s actually different heights to the, the triangle, so to speak. To mix the air from the pressure and the [00:02:00] suction side to reduce the, the level of noise coming off the blade  Nicholas Gaudern: e Exactly. So we have, uh, we have an asymmetry to the part. We have these different tooth lengths. We have, uh, a lot of changes in thickness going on across the part. So it may be a little bit difficult to see on the camera, but these are quite sculpted 3D components. They’re not, they’re not flat stock white triangles. No, no. There’s a lot of thickness detail going on here. We’ve paid a lot of attention to the edges. We’ve paid a lot of attention to these gaps between the teeth as well. So all of this is about trying to figure out what is the best way to reduce noise. And something that not a lot of people will, will admit, but it’s true, is that as an industry we don’t really understand the fundamentals of how serrations work.  Allen Hall: It’s a complicated  Nicholas Gaudern: problem. It’s a really complicated thing. Problem, yeah. Yes. So trying to simulate it in CFD is an absolute nightmare. The, the mesh sizes required, the physics models required are really, really difficult. So what we found is that you’re probably better off spending [00:03:00] most of your time and money in the wind tunnel. Yes. So, so we go to DTU, they have this wonderful, uh, air acoustic wind tunnel, the pool of core tunnel. It’s one the best tunnels in the industry for doing this kind of work. It  Allen Hall: is  Nicholas Gaudern: because you can measure acoustics and aerodynamics at the same time. So this allows us to do a lot of very cost effective iteration for this kind of design work. So we know what’s important. You know, we’ve, we’ve studied all the different parameters of serrations lengths, aspect ratios, angles, thicknesses, all this kind of stuff. And it’s about bringing them together into a, into a coherent product. So this is, this is a result of a lot of design of experiments, a lot of iteration, and combining wind tunnel and CFD to kind of get the best of both of those tools. So,  Allen Hall: so what’s the. Noise reduction compared to those standard triangular trailing aerations. Yeah.  Nicholas Gaudern: So there’s lots of different ways of, of thinking about noise reduction, but I think probably the most useful is the O-A-S-P-L. So this is the overall sound pressure level. Right. Is kind of what [00:04:00]typically you’ll be measuring in an IEC test.  Allen Hall: Right.  Nicholas Gaudern: And that’s measured in decibels, but a way to decibels because it’s important that we’re waiting to what the human ear can actually hear. Right. Perceive. Exactly. So that’s the numbers we report. For the field test we’ve recently completed with Silent Edge, we’re seeing up to five decibels of O-A-S-P-L noise reduction.  Allen Hall: Okay. So what’s that mean in terms of what I hear on the ground?  Nicholas Gaudern: So that is an absolutely huge reduction. It’s multiple times of reduction because you know, decibels on a log scale,  Allen Hall: right? Nicholas Gaudern: So five DB is is enormous. It’s  Allen Hall: a lot. Yeah.  Nicholas Gaudern: And what’s really interesting is that if you have a turbine that’s running in a noise mode, just one decibel reduction. Of power, sound, sound, power level might be three or 4% P loss. I mean, that, that’s, that’s huge. Think about that loss. So if you need to reduce noise by five decibels to get within a regulation, imagine how much a EP you have to throw away by basically turning down the [00:05:00] turbine to do that. Allen Hall: That’s right.  Nicholas Gaudern: So that’s really what the, the business case for these kind of products is. It means you can escape noise modes because as soon as you use a noise mode. You are throwing away energy.  Allen Hall: You’re throwing well you’re throwing away profits.  Nicholas Gaudern: Exactly.  Allen Hall: So you’re just losing money to reduce the noise. Now you can operate at peak.  Nicholas Gaudern: Yep.  Allen Hall: Power output without the creating the noise where you have that risk. Right. So, and particularly in a lot of countries now, there are noise regulations. Yes. And they are very well monitored.  Nicholas Gaudern: Yep.  Allen Hall: We’re seeing it more and more where, uh, government agencies are coming out and checking. Yes. ’cause they have a complaint and so you get a complaint. Oh, that’s fine. Or someone can complain. Yeah. You know, you need to be making your numbers.  Nicholas Gaudern: Yep. And, and the industry needs to be good neighbors, you know? It  Allen Hall: certainly does.  Nicholas Gaudern: Uh, we have to make sure that people are, you know, approving and comfortable with having wind turbines in their backyard. Sure. And noise is a big part of that.  Allen Hall: It is.  Nicholas Gaudern: So yeah. Ap sure. That’s really important. Being a good [00:06:00] neighbor also important.  Allen Hall: Right.  Nicholas Gaudern: Meeting the regulations. Obviously you have to meet the regulations. So this product, um, has been through a really long development cycle, and we’re now putting the final touches to the, to the tooling. So this is available now.  Allen Hall: Oh, wow.  Nicholas Gaudern: Okay. Great. Um, and we’re hoping that in the next uh, few months we’ll be getting even more turbines equipped out in the field with, with the technology.  Allen Hall: So, oh, sure. There’s a, you think about the number of turbines that are in service, hundreds of thousands total worldwide. A lot of them have no noise reduction at all.  Nicholas Gaudern: No. No.  Allen Hall: And they have a lot of complaints from the neighbors.  Nicholas Gaudern: Exactly.  Allen Hall: Trying to expand wind into new areas, uh, is hard because the, the experience of the previous Yes. Neighbor  Nicholas Gaudern: Yep.  Allen Hall: Grows into future neighbors. So fixing the turbines you have out in sight today helps you get the next site. I know we don’t always think about that, but that’s exactly how it works. Yeah, of course. Uh, we need to be conscientious of the people of the turbines we have in service right now. So that we can continue to grow wind [00:07:00] globally and more regulations on noise are gonna come unless we start taking care of the problem ourselves. Nicholas Gaudern: Yep. And another really important thing with Serrations is that you have to design them so that they don’t impact the loads on the rest of the turbine.  Allen Hall: Right. And people forget about that.  Nicholas Gaudern: Yes.  Allen Hall: Can you just, can’t just throw up any device up there. And think, well, my blade’s gonna be happy with it. It may not be happy with that device. Nicholas Gaudern: You have to really carefully understand w
Vineyard Wind Sues GE, Ørsted Overhauls Its Board
2026/04/21
Vineyard Wind sues GE Renewables to block a walkout over $300M in withheld payments and defective blades. Plus Ørsted posts a $262M quarterly loss and shakes up its board. Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us! Uptime316 Matthew Stead: [00:00:00] The Uptime Wind Energy Podcast brought to you by Strike Tape, protecting thousands of wind turbines from lightning damage worldwide. Visit strike tape.com And now your hosts. Allen Hall: Welcome to the Uptime Wind Energy Podcast. I’m your host Allen Hall, and I’m here with Matthew Stead and Rosemary Barnes who are in Australia. Before we get too far into this episode, I would like to mention that the UK US relationship has been very tense recently, as you have seen in the, in the news articles and on television. But there was one good news piece that just happened, which is the band Oasis just got inducted into the Rock and Roll Hall of Fame. So that is trying to mend those relationships, bring the UK and US back together. In at least a musical sense. So I know Rosemary was watching that closely as the votes were counted. But, [00:01:00] uh, everybody in the UK is super thrilled about it as they should be. And all us Oasis fans can’t wait for the induction ceremony. In fact, we’re planning to go to Cleveland. They’ll go watch it if we can. We shall see now onto more important information this week. Vineyard, wind and GE are not getting along. And if you have been paying attention for the last two years, you would’ve noticed that there’s been a couple of tense moments. Well, uh, that wind project is a little bit up in the air because vineyard wind has filed suit against GE renewables to stop the turbine maker from walking away after GE sent a termination notice. Over a $300 million ish, uh, disagreement in unpaid bills. At the center of this dispute are defective blades, of course, that, uh, broke off in 2024 and caused a number of problems, uh, for GE and vineyard Wind is particularly a delay in the [00:02:00] project and ge having to fix pull blades off of turbines that were already installed and I think they ended up sending those back to France. Reading the lawsuit, it seems like GE did not repair those blades. They replaced those blades because, uh, they may not have been able to repair them or maybe is the amount of time it’s gonna take to repair them. You can repair almost anything made out of. Composite. Uh, but this is a big problem because, uh, if GE does walk away and they’re talking about walking away from this project at the end of April, vineyard, wind believes that the turbines are not ready to be operated, and they don’t have a way to operate those turbines. They don’t have the knowledge or the people because the people belong to GE that need to make some of these turbines operate. Even there’s even some question about if all the turbines are operating at the required [00:03:00]handover requirements. This is unique because I don’t think I’ve ever seen a wind turbine manufacturer leave before a wind site is finished. It must have happened before, but. It does put both sides in quite a pinch. Right.  Rosemary Barnes: Can I just jump, jump back to, to something that you said, um, that you can repair almost anything when it comes to composites? I would say that that doesn’t necessarily apply if your design was insufficient in the first place. And I mean the design for manufacturing in this case, I think that the, like computer model design worked fine, but obviously it was not as easy to manufacture or as possible to manufacture. With the correct quality as what they expected. It can’t have been so simple to just, just repair. That’s, um, that’s what I want to say. Like it, it’s obvious to me that if it was possible to repair, that would’ve been much easier than what they’ve ended up with, which I think is pretty foreseeable. Or most [00:04:00] engineers would probably have foreseen that if you, you know, put blades out there that, um, don’t meet your. Standard, um, quality control acceptance criteria that, you know, the consequence of that would be that it would be more likely to fail. So yeah, I think you can repair nearly anything on a standard blade that is possible to make correctly. But if you’ve got big quality problems, then it’s not, it’s, it’s not easy and it’s possibly not possible to, you know, just get, um, just get onto that in repair.  Matthew Stead: I, I think you’re both right. Because it all comes down to economics. So I think Alan’s statement, you know, things can be repaired. It just comes back to economics, doesn’t it?  Rosemary Barnes: U usually, yes. And like for your average, like if you’ve got a wind farm and you’ve got a blade with a big, a big repair, or you know, like a big defect right on the main laminate, that’s gonna require, you know, like a huge repair, taking the blade down and keeping it down for, you know, like three months while you rebuild like 20 meters [00:05:00] of laminate. Yes, that would be technically possible, but you wouldn’t because it would be so expensive. So us usually, like in 99% of cases, that would be it. That it’s not actually impossible to repair. It’s just very hard. But, you know, in these really huge blades and, you know, um, bearing in mind that I don’t, I don’t know the specific quality problems that they face, but, you know, just from my knowledge of composites, you can say what the challenging areas would be, but you know, a really big blade is gonna have a really thick laminate and, um, composites don’t like to have really thick laminates. When they cure, it’s usually an, an exothermic reaction, puts off heat, you know, like the temperature is changing and um, it works fine for thin laminates, but when it’s really thick you can get hot spots and cold spots and maybe it’s hard to get the resin to go all the way through evenly. But you know, imagine if you’ve got a really thick laminate and there’s a chunk of it that just didn’t get any resin in it. How are you gonna repair that? Like, I wouldn’t say impossible. I’m sure if the fate of the human race depended on it, then you would, you would make it work. But it’s [00:06:00] certainly very close to impossible.  Matthew Stead: Economically, it does not make sense.  Rosemary Barnes: You would probably have to make a few inventions. Along the way to be able to make it work as well. I think,  Allen Hall: I think I should read part of, and I don’t like reading these lawsuits, but this is informative in a sense that it provides some relative background as to what Vineyard Wind is thinking in some of the contract details that are involved here. So in June 4th, 2021, this is directly from the lawsuit, uh, vineyard Wind entered into A TSA with GE renewables in which. GE Renewables agreed to design, manufacture supply, install commission, and test the wind turbine generators for the vineyard wind project at a contract price of more than $1.3 billion. There you go. On the same day as an integral part of the commercial agreement, the parties entered into an SMA, uh, by which GE renewables agreed to maintain and service that wind turbine [00:07:00]generators for the first five years. Of operations of the project and guarantee that all wind turbine generators will operate at a 97% of production availability. Uh, this guarantee is central, is a central component of the commercial viability of the Vineyard Wind Project. So I would say so, right. Uh, at present, all of the wind turbine generators on the project have been installed. However, the wind turbine generators are not yet fully operational and are. Able to reduce power at only levels well below those intended under the contracts fundamental to the project’s commitment to Massachusetts to achieve full commercial operation. The project requires repair, commissioning, and maintenance of GE renewables, 62 proprietary wind turbine generators, and their component parts work that only GE renewables knows how to perform. So it sounds like Vineyard Wind has a five-year contract that GE ISS gonna operate these [00:08:00] turbines, and if they leave in a couple of weeks, vineyard wind really doesn’t have a backup plan. They may have. Were planning on a plan five years down the road where they could operate ’em, but to operate those turbines immediately when they haven’t, at least as. Indicated here may not be fully commissioned to providing the right amount of availability. That’s a huge problem for Vineyard. Huge.  Rosemary Barnes: It’s interesting to me that they’ve decided to withhold some money that I think everyone agrees that they owe that money to ge. But then there’s a dispute because Vineyard when says that GE owes them money for some other stuff That sounds like GE disputes. Um, it’s like if you have a problem. With your landlord, they always tell you, don’t, don’t withhold rent, because then they can, you know, that’s, that’s their out of the contract. Right? So it seems weird, like it’s a relatively small amount compared to what vineyard wind is risking. So. It seems to me like, are they, is this a mistake from them? Are they giving ge an out from this contract that’s gonna be [00:09:00] really hard for them to meet? It might be that GE knows what it would cost to entirely fix the wind farm and have it producing the way that it should. But, you know, let’s say in a worst case scenario, that means remaking every singl
Ørsted Installs at Sunrise Wind, Pentagon Blocks 7.5 GW
2026/04/20
Allen covers Ørsted’s first turbine install at Sunrise Wind, Cadeler’s fleet expansion, the Pentagon’s 7.5 GW onshore backlog, and the UK’s £154B onshore wind opportunity. Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us! Happy Monday, everyone. While headlines this week captured courtrooms and bankruptcy filings and permitting backlogs, out on the open water and deep inside factory order books, the wind turbines kept getting built. Let us start off the coast of New York. Friday morning, April seventeenth, Ørsted installed the first wind turbine generator at Sunrise Wind — a 924-megawatt project, 84 turbines when complete. This is the same Sunrise Wind that was shut down just four months ago. The same Sunrise Wind that won a preliminary injunction in February. The same Sunrise Wind the Trump Administration chose not to appeal. And now the first turbine stands above the water. Cadeler’s wind turbine installation vessel Wind Scylla is doing the work. She just finished the same job at Revolution Wind. Ørsted says first power flows to New York later this year. Commercial operation the second half of 2027. Six hundred thousand homes on the grid. Now follow us across the Atlantic. In the Polish Baltic Sea, another Cadeler vessel just began her maiden campaign. Her name: Wind Mover. Delivered last November from Hanwha Ocean in Korea, ahead of schedule. This new M-class installation vessel now sits at the 1.2-gigawatt Baltic Power offshore wind farm, installing Vestas V236 turbines — 15 megawatts apiece. Wind Mover’s sister vessel, Wind Osprey, is moving to the United Kingdom to start work at East Anglia Three. Cadeler has doubled its fleet in twelve months. By mid-2027, twelve vessels — the largest offshore wind installation fleet in the industry. While turbines go up on the eastern side of the Atlantic, on the western side a different kind of wait is setting in. Bloomberg reported last week that the Pentagon is sitting on a backlog of at least 30 proposed American wind farms — 7.5 gigawatts of onshore capacity. Paperwork stalled. The issue is Section 10-32, the Defense Department’s review to ensure turbines do not interfere with military radar or aviation. Jason Grumet, head of the American Clean Power Association, calls it direct obstruction. His group sent a letter to the Pentagon earlier this month. The deadline for a response was April eighth. That deadline came and went. Seven point five gigawatts, waiting. Now turn to the United Kingdom, where the direction could not be more different. A new report commissioned by Renewable UK and written by consultants at Everoze says expanding Britain’s onshore wind supply chain between now and 2050 could add £56 billion in economic value. That is on top of another £98 billion already expected — a total of £154 billion. UK onshore capacity is set to grow from 16 gigawatts today to more than 50 gigawatts by 2050. Seventy percent of lifecycle spend already stays in the UK. The report points to blades, towers, nacelles, drivetrains, and electrical gear for substations as the highest-value opportunities. So let us step back. One turbine above the water off Long Island. A new vessel installing 15-megawatt machines in the Polish Baltic. Seven point five gigawatts of American onshore wind held up in Washington. And £56 billion staked on British onshore. The policy fights are loud. The legal fights are louder. But this past week, the turbines went up. That is the state of the wind industry for the 20th of April, 2026. Join us for the Uptime Wind Energy Podcast tomorrow.
ECO TLP Brings Concrete Foundations to Floating Wind
2026/04/16
Nicole Johnson Murphy, CEO of ECO TLP, and Gordon Jackson join to discuss concrete floating wind foundations, production-line construction, and markets from Hawaii to Japan. Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us! Welcome to Uptime Spotlight, shining Light on Wind. Energy’s brightest innovators. This is the progress powering tomorrow. Allen Hall: Offshore wind obviously is a big deal right now. There’s a lot of, countries looking at it and investigating it, doing it, but not really at scale yet. And this is where ECO TLP comes in and. Nicole, let’s just start there with a background. What problem were you trying to solve when you started ECO TLP? Nicole Johnson-Murphy: Yeah, so, we were designing for, a site off of Hawaii in 2011, for the HECO RFP. And so we were designing for 300 meter water depth from the beginning. so we were always trying to find a way to work with the ports, with the vessel, with the infrastructure that was existing off Hawaii. And with, and that worked with Jones Act vessels. So we were always trying to meet that [00:01:00] requirement with, and meet the cost, try to, we saw there were much tighter margins in offshore wind than in oil and gas, for example, at that water depth. So we’re trying to find something that was cost effective.  Allen Hall: Next question, obviously is what makes those deep water foundations so difficult? Gordon Jackson: It’s the water depth, primarily, you need to put foundations down in, extremely deep water. and they’re gonna be pretty flexible. so you’re trying to control the amount of motion that you get at the surface through your, your deep water, facility. it’s really. Really that challenge, and, the weight of components through the water depth, likes of chain would be completely impossible. in 300 meters of water. you need to use something that’s a little bit lighter. Yeah, to mow you to the, to the seabed. Allen Hall: [00:02:00] Because it does seem a little odd just not to make the foundations taller, basically. More steel drive it down in, we know that process, we understand that process. It works offshore, near shore in a, lot of locations. But once you get to what depth as it becomes financially or engineering wise, impossible.  Gordon Jackson: For offshore wind, fixed, structures in, maybe a hundred meters of water are gonna be. Economic. they’ll be costly compared to what’s been done now because, of all the extra structure you need for the, for the deeper water. But, I think you’ll see, a crossover between fixed and floating, around the, 70 to a hundred meter water mark. that’s sort the range. Allen Hall: And that leads to the next question, which is. It’s all financial, right? At some point, the numbers [00:03:00] don’t work. If the cost of foundations don’t come down, especially in fixed bottom offshore or floating offshore, we lose a lot of offshore wind resource. Nicole can you gimme a scale at what we’re missing if we don’t get to a more economical solution for floating offshore? Nicole Johnson-Murphy: So we’ve estimated for our market for, a very deep water market. So we now actually have a solution that goes across all water depths. So we’re starting with, this, gravity based structure now with, and, Gordon’s team has been really involved in that, development. And then now we can take that same slip form, concrete cylinder. Format and take it across all the water depths. so we basically can hit every water depth now for a very low cost. It’s a very simple, just, local, regionally designed and built, system. We, crowdsource the labor and the inputs. and so we [00:04:00] try to, and we also try to give the procurement team of our clients their, an ability to do their job and, be able to bid out aspects of our design, across. Different vendors. So you always wanna give, in construction, you always wanna give, the procurement team a job to do so they can actually get that price, keep that price down on the installation.  Allen Hall: Yeah, that’s a unique look that ECO TLP is putting to this problem. Which is moving away from steel, which is expensive obviously, and it’s difficult to transport at times to a more localized solution, which is concrete. And thinking about the problem a little bit differently, does that open up a number of doors then in terms of the countries that can get involved in, floating or near shore, wind projects, but just because you’re driving the cost down?  Nicole Johnson-Murphy: Absolutely. And I’ll let Gordon speak to that.. He’s worked. His whole career in offshore concrete. But I think it’s, I think it’s a, great, it’s the only way we would do it. We actually have shipyards in our companies, our partners own [00:05:00] shipyards, and we, just would never probably ex try to create this many units across the world and scale and steel. We’d only do concrete.  Gordon Jackson: Yeah. My first concrete project broke the mold of how you do, construction of concrete offshore structures. it was entirely built within a dry dock and, After we’d gone on and delivered that project, that was in the late eighties. I spent the next 10 years, working on projects all around the world, looking at doing the same sort of thing in different countries. because you only needed, 10, 12 meters of water, at the shore and you could, build a structure and get it out there in the water. It really opened up the market for offshore concrete structures that, that, first project that we did.  Allen Hall: So using that first project as leverage and knowledge of how to do these things, how much advantage [00:06:00] does concrete give you over steel? Gordon Jackson: It’s difficult to say because it bends country to country. And, quite often you’re competing against, steel built in some, very low cost fabrication countries. so if you’re in a high cost, high labor cost country, I worked in Australia, and the labor cost there was extremely high. So concrete wasn’t particularly cheap, but the overall solutions that we came up with, were cheap. Allen Hall: So does that involve basically like slip forms or how are you, thinking about that problem? Because it’s a huge engineering task and you only learn. By doing it on some level because all great plans, always run into trouble as soon as you try to implement them. So you took all that previous knowledge and then applied it to this problem, and now you have, basically [00:07:00]trimmed or, slimmed, the design down into, you have a, very economical model, even in more uneconomical economies because of labor laws and cost of labor and access and those kind of things. What does that look like now? And what’s your thought process on, Hey, this is what it’s gonna look like? Can we get, quayside how do we do this and how do we keep this thing simple? Gordon Jackson: The key thing is we’re looking at, a production line approach, which has been, it’s tried and tested for, for marine, concrete construction, construction of quay walls and and the we’re using exactly that same system. We’ve just been tried and tested to create a production line of, ECO TLP units or ECO GBS units where we’re building, onshore and where we’re going from station to station, doing a task at each station. [00:08:00] So it’s exactly like a production line, that you’re be familiar with and, you load out the completed structure onto a barge, and then you. Submerge that barge and your structure floats off and that’s, the real key to getting the, the economy from the concrete basis.  Nicole Johnson-Murphy: Yeah, and I’ll say that the OpEX is really something we focus a lot on because it’s not just what you’re doing on the CapEx and the development and the port, it’s actually that 30 year lifetime maintenance. And this is a, when you, we fully submerge our floater, which is basically inert in the ocean. It’s, very eco-friendly with the ocean. There’s no paint, there’s no, maintenance on the floater over the lifespan. You’re, monitoring those, the moorings and the, weight of any marine, buildup on those moorings and things like that. But generally it’s a very low maintenance solution and it’s very heavy and a comfortable car [00:09:00] ride for the turbine. It really has slow motions. it’s, almost like a, a high skyscraper in the water. you’re just the top of that skyscraper is moving a little bit. But you’re, you’re really giving it that comfortable, slow ride over its lifetime. It’s not hitting a lot of turbulence, like a different type of floater.  Allen Hall: Yeah. It is a different concept, really, right? That you have this mass at the bottom and you have this mass at the top, which is the, cell on the wind turbine. And if you can design it just right, everything dampens becomes stable. Even in turbulent water. How long did it take you to figure out that aspect of the design? Because it does seem like a lot of projects hit a, an end point right there because the motion of the turbine is not good for the lifetime of the turbine.  Nicole Johnson-Murphy: We, look at it as a, kind of hybrid spar, TLP so, the original design came from my late father who was, who had designed Ekofisk for Phillips [00:10:00] petroleum in the early. Late sixties, And, so he’d come from oil and gas and he’d come from that concrete, construction background. And, he is very comfortable with it. And I think, Gordon, that’s part of why I like working with Gordon ’cause G
White House Misses Appeal Deadline, France Targets Chinese Magnets
2026/04/14
The crew discusses the White House missing its offshore wind appeal deadline, France’s 12 GW tender with restrictions on Chinese permanent magnets, and WOMA 2027 planning. Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us! The Uptime Wind Energy Podcast brought to you by Strike Tape, protecting thousands of wind turbines from lightning damage worldwide. Visit strike tape.com. And now your hosts. Allen Hall: Welcome to the Uptime Wind Energy Podcast. I’m your host, Allen. I’m here with Rosemary Barnes, who is in Australia, and our newest guest is Nikki Briggs, who is the new CCO of Weather Guard Lightning Tech. Welcome to the show, Nikki.  Nikki Briggs: Thank you. Nice to, nice to be here.  Allen Hall: So there’s the full docket, and Nikki’s gonna get indoctrinated today to the podcast, and she’s gonna be holding on tight because we have a really, uh, very controversial podcast. I think once Rosemary gets in here and starts talking about. Offshore wind. And I wanna lead off this week ’cause it is a big deal, although not many people are talking about it, that, uh, the White House missed a deadline to file an [00:01:00] appeal against all the offshore wind farms in the United States. And the feeling was, is that there was gonna be an appeal and they’re gonna push to slow down those projects or cancel those projects. And obviously, uh, one of the purchasers of one of the sites decided to sell it back to the US for about a. Billion US dollars, but the administration missed a key deadline for appeals, uh, which may indicate that they have other things to do besides fight offshore wind Now. The question really remains is, is this going to continue on that nothing is going to happen. Uh, hopefully all the wind projects that are being built at the moment will complete and we’ll be providing power to all the onshore locations, particularly up and down along the East coast. But, uh, there’s still a long way to go here. Rosemary, I know there’s been a lot of concern about what’s happened in the United States on offshore [00:02:00] wind for several months now. You think this is gonna be just a change of direction because there’s other things happening in the world.  Rosemary Barnes: To me, it just sounded like too hard to, unlikely to actually succeed and kind of keeps on drawing attention back to the issue. So better to just kind of let it quietly fade away and not talk about it anymore. Allen Hall: And there is a financial emphasis for those companies that have these wind farms because if they can get their projects done. They get paid sooner. They can produce power, obviously they’re gonna get paid sooner. So there is a big incentive to push, push, push, push. And a lot of the projects are delivering power right now. And I think the, the biggest one, which is uh, dominion Energy’s Project of Coastal Virginia, offshore Wind is doing that. So. All these wind projects that are kinder in a way I think are going to finish, which is gonna be a, a big relief to a lot of the states.  Rosemary Barnes: I don’t wanna talk about us, um, politics because I am not living there. But don’t you have midterms coming up and potential [00:03:00] for the situation to dramatically change? Like, my understanding is that the expectation is that there will be. More, um, democratic involvement in, in decision making after the midterms. And so surely, you know, like if they don’t, if they’re not acting now, then things are likely to be easier from here on out. Is that, is that a correct interpretation of what’s going on over there?  Allen Hall: Not correct. And Nikki, you can jump in here too. Congress can change and does every two years there’s elections in the US and so the full House of Representatives is voted in or out. So all 435 members of the House of Representatives have an election, but about a third of the Senate has an election. So the Senate doesn’t change as dramatically as the House does, but, uh, for everything that’s been codified into law, which happened a year and a half ago, uh, the executive branch can kind of do what they [00:04:00] want there. So there will be very little that Congress can do. Once a law is a pass and the executive branch can continue on,  Rosemary Barnes: it’s two year terms for your house of reps. Allen Hall: Yeah. It’s two years terms. Yeah.  Rosemary Barnes: That’s not very long. That’s not very good job security.  Allen Hall: It was never meant to be  Rosemary Barnes: in school. About a thousand years ago, I learned that, um, the Australian government is, is, is largely based on a combination of um, UK and. US government basically. But I think it’s a lot closer to the us. Um, and yeah, we have, I, I think we have not, we haven’t got fixed terms, but it’s usually about every three years and yeah, you lose a few, a few months, but we don’t, we don’t do the big song and dance about it that you do with all of the, um, pre-selection and all that stuff. We don’t do that. So our, our system is a lot quicker. Um, so yeah, I just wonder like how, how do you actually govern when you have to spend half of your time worried about, um, getting in and then you can only make plans for basically one year [00:05:00] ahead or two years ahead, like at the absolute maximum.  Allen Hall: That’s the problem with House of Representative is you nailed it right on the head, which is they’re constantly fundraising and trying to get to the next election. Two years is a short amount of time anymore. They didn’t used to do it like that, where the last six months, maybe a year were campaign time, but pretty much once they get an election over, which happens in November, they’re already campaigning for the next one. So it does lead to a lot of chaos where things don’t happen in the House of Representatives like. They used to maybe 20, 25 years ago. It’s changed dramatically and I don’t think Australia has that same issue weirdly enough. Although I would say you’re becoming more like the US in a lot of ways. That’s not one of them.  Rosemary Barnes: We’ve got some, there’s some things in place, like one of the advantages of basing our system on other countries as we could take. Take the bits that worked and see what, what we could already see what didn’t really work and um, you know, try to, try to take it, um, try to take care of that, ensure that it couldn’t happen. [00:06:00] So  Allen Hall: the offshore wind piece in America rolls into other offshore wind, uh, across Europe in that, uh, although US is reconsidering offshore wind in some sense. Europe is not. In fact, uh, France is getting very active. So you remember the France has been trying to launch, uh, offshore wind tenders for about two years. So you keep hearing France is gonna go to offshore wind, and then it didn’t really happen. Well, that political gridlock is, uh, over really how to pay for the renewables, uh, and how they’re gonna try to finance this thing. Meanwhile, uh, France has, uh. Less than what? Two gigawatts of offshore wind operating against a, a national target of about 15 gigawatts by 2035. Uh, so there’s a lot of catching up to do the 12. They just had a 12 gigawatt package. They announced where, uh, they, they’re [00:07:00] attempting to really catch up all at once, uh, but buried inside of this tender. Is a supply chain rule, which is very unique. So coming outta Scotland and all the things that happen with Ming Yang in Scotland, France is doing something very similar. France is limiting the percentage or the quantity of permanent magnets that can come from China. So France is saying, Hey, they don’t wanna get locked into an offshore, offshore wind supply chain that involves China specifically for, but they’re probably the most important ingredient, which is. Permanent magnets. The Netherlands is moving ahead also and has offered two one gigawatt offshore wind farms, and it’ll be permitting those pretty quickly. So all of a sudden, the offshore wind effort for some of the countries that have been quiet in Netherlands in particular, and then France, all of a sudden probably ’cause of what’s happening in the. The straight in the Middle East have decided to speed up their offshore wind [00:08:00] projects. Is this gonna be the right move? Do you think they’re gonna stick with this process of, of completing these projects or is this a spur of the moment decision that they’re gonna change their minds later on in the next year or two once things calm down to the Middle East? Rosemary Barnes: Yeah. I mean, if it is a, a knee jerk response to the. Specific right now problem and doesn’t seem very well advised because it’s gonna be years before they actually see any electricity entering their grid. I mean, France is a bit different to other European countries ’cause they’ve got so much nuclear and in general, uh, I think with the exception of like the year before last, they had that summer where it was really hot. They had heat waves and they had to shut down a lot of. Nuclear power plants because the cooling water was too hot. They, they couldn’t, they couldn’t put it back into the river. And, um, yeah, uh, river levels were too low in some cases. So in, in that year, they did have to import energy. Um, but in general, their energy exporters. So I don’t, I, I would be surprised if this [00:09:00] was in direct response to, you know, that I don’t think they have an elec
Vineyard Wind Sues GE Vernova, US Monopile Factory Bankrupt
2026/04/13
Allen covers EEW American Offshore Structures’ Chapter 11 filing, Vineyard Wind suing GE Vernova for $545 million, Europe’s exit from Korea, and wind project wins in Australia and Canada. Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us! There is a story unfolding across this industry right now. It is a story of two worlds. One world is closing its doors. The other is throwing them wide open. Let us start in New Jersey. EEW American Offshore Structures filed for Chapter Eleven bankruptcy on April eighth. This was the first monopile manufacturing facility ever built in the United States. New Jersey Governor Phil Murphy announced a two hundred fifty million dollar investment in the Paulsboro Marine Terminal back in twenty twenty. It was called the largest industrial offshore wind investment in the country at the time. At full buildout… five hundred thousand square feet of production space. More than one hundred monopiles per year. Five hundred workers. They even built the first American-made monopile… for Orsted’s Ocean Wind project. It weighed three million pounds. It measured three hundred feet long. Then Orsted canceled Ocean Wind One and Two. Then Shell pulled out of Atlantic Shores. Without contracted work… workers disassembled and recycled finished monopiles for scrap. Federal policy shifts removed the pipeline of future projects. A landlord eviction filing followed. And then… Chapter Eleven. That is a two hundred fifty million dollar facility… with nowhere left to go. Now stay with us. Because just offshore… another American offshore wind story is fighting for its life. Vineyard Wind… the sixty-two turbine project fifteen miles south of Martha’s Vineyard… filed suit in Massachusetts against GE Renewables. GE Vernova says Vineyard Wind owes it three hundred million dollars for work already performed… and it wants to walk away at the end of April. Vineyard Wind says not so fast. The developer says GE still owes five hundred forty-five million dollars for what it calls inexcusably poor performance after a catastrophic turbine blade collapse in July of twenty twenty-four. Fiberglass blade fragments washed onto Nantucket beaches during peak tourist season. Sixty-eight of seventy-two blades had to be removed and replaced. That set the project back nearly two years. Construction did reach completion in March… making Vineyard Wind the first offshore project to finish under the current administration. But now the only contractor capable of completing the remaining work… wants out. A court hearing was scheduled for Thursday. And now… look eastward. Something similar is playing out in Korea. European offshore wind companies are exiting the Korean market one by one. Corio Generation, a British firm owned by Macquarie, disbanded its Korean unit and pulled out of joint projects in Busan and Ulsan. Germany’s RWE quit offshore wind projects in Taean and Sinan counties. Vestas postponed its turbine factory in Mokpo… indefinitely. Equinor began reducing its Korean workforce. Shell exited the Korean offshore market entirely in twenty twenty-four. These companies point to worsening global profitability… and Korean government policies they say favor domestic companies over firms with greater experience. Korea had a target of three gigawatts of offshore wind by twenty thirty. That goal is now in serious doubt. But here is where the story turns. Not every market is closing its door. Eight thousand miles from New Jersey… in the Sunshine State of Queensland, Australia… the final forty-one turbines just arrived at the Wambo wind project. Cubico Sustainable Investments and Stanwell are building a five hundred six megawatt project on the Darling Downs. Stage One… two hundred fifty-two megawatts… already feeding the Queensland grid. Stage Two deliveries are now complete. Commissioning and full operations are on track for the end of twenty twenty-six. And up in Ontario, Canada… the province just approved fourteen new wind and solar projects totaling more than thirteen hundred megawatts. The average price… eight point eight cents per kilowatt hour. Compare that to twenty-one point four cents for some proposed nuclear projects… and more than thirty-two cents for certain new reactor designs. Contracts run for twenty years, with all projects online before twenty thirty. So let us step back. In New Jersey… the first American monopile factory files for bankruptcy. Off Massachusetts… a completed offshore wind farm fights to keep its contractor. In Korea… European developers pack their bags. But in Australia… turbines arrive on schedule. And in Canada… wind power undercuts nuclear at the meter. The wind energy industry is not in retreat. It is choosing its battlegrounds. And where the conditions are right… the blades are turning. And now you know… the rest of the story. That is the state of the wind industry for the 13th of April, twenty twenty-six. Join us for the Uptime Wind Energy Podcast tomorrow.
Tilt Renewables’ Dr. Liz Beavis on Wind O&M in Australia
2026/04/09
Dr. Liz Beavis, Asset Manager at Tilt Renewables, joins to discuss O&M contracts, balance of plant, and lessons from Australia’s biggest and oldest wind farms. Contact Liz on LinkedIn or by email. Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us! Intro: [00:00:00] Welcome to Uptime Spotlight, shining Light on Wind. Energy’s brightest innovators. This is the Progress Powering tomorrow. Allen Hall: Liz, welcome to the program. Thanks,  Liz Beavis: Alan. I feel I’m a long time listener. First time caller, so it’s exciting.  Allen Hall: You are a long time listener and thanks for doing that. Uh, and Liz, I just find you to be a wealth of knowledge and, uh, we met on a couple occasions since I’ve been in Australia and it’s just, uh, a fun to connect here because I think a lot of the things that are happening in Australia need to be spread around the world. A lot of, uh, good o and m practices happening in Australia, uh, from hard lessons learned. So that’s what I want to dive into today. And then the first one is, I don’t think many people realize this, that you went. From commissioning, Australia’s largest wind farm, Cooper’s gap to managing seven [00:01:00] of the 10 oldest operational wind farms in the country. So you got some of the biggest, newest to some of the oldest assets. Uh. Uh, my question is like, when you started that, did you just kind of assume like wind, wind farms or wind farms or wind turbines or wind turbines and you could just basically own and end them the same, or do, or did it just occur to you immediately like, I need to take a different plan of attack here? Liz Beavis: I think I, I knew nothing about wind farms when I turned up at Cooper’s Gap, so, so yeah, I got my, well, okay, we’ll go right back to the start. So I was working at a thermal power station and I was just thinking. There’s no future in coal. How do I get into renewables? And then a wind farm got built like 50 kilometers from my house. I can, I can see it in the horizon. Um, and I thought, oh, they’re not gonna need a chemical engineer there, but I wonder if they need a site manager or something. And then the site manager role came up, I applied for it. So the services site manager. So, [00:02:00] um. That was July, 2020. That’s when I first started listening to the podcast. ’cause I thought I better find out something about this industry before I do my job interview. And so I’ve been listening ever since. But, um, yeah, so I don’t know. I was just lucky to get that role. And I turned up and, um, I think it was the end of September, 2020 first time I’d ever set foot on a wind farm ’cause of COVID and everything. I didn’t, I didn’t go there for the interview. My manager was in Thailand. I just turned up. And, um, so they, they’d finished construc, they’d built all the towers where they hadn’t finished commissioning. And so we’re still working out of construction, dongas, you know, temporary buildings and um, and there was hundreds of people on site and it was just the absolute chaos of. Constructing a two hundred, a hundred and twenty three turbines. You know, like there’s just people everywhere. And I thought, wow, I’ve just gotta figure out what I’m supposed to be doing here. There were a few technicians. I found out how many technicians I supposed to have. Just started recruiting, started figuring out what I was supposed to be doing there, and I just [00:03:00] learned so much. In the two years we took over the new r and m building. We had failed gear, boxes, generators, transformers, overhead line, underground line, pretty much. Anything that could fail failed, and I got to see what we needed to do. Um, but through all of that, I was also thinking, oh, how do I manage this wind farm better? I don’t know anything about wind farms, and I’m reaching out to the other GE sites, but the, the next biggest site was 75 turbines, and all of the rest of them are 30 and 40. So they’re saying to me, oh, you just get a team to go around. And I’m thinking. Well, that’s six weeks of work. You know, like, like everything is so much bigger on a bigger wind farm. And then I’d reach out to the, the American sites. That had big wind farms, but their contracts were so different, and I didn’t understand at first, I started to realize, well, their contracts are completely different and their focus is different, and so they’re not facing the same issues that I’m facing. Um, and then, you know, even speaking to a wind farm in [00:04:00] Sweden that was a similar size, but they, you know, they. They have to think about climate and what work they can do in winter. So I started to, as you said, you start to think, well actually everyone farms very different. And it’s, um, you know, you can learn from others, but you really need to understand how your conditions are affecting what you can and can’t do. Um, and then, so then I got the job at Wally Power Services with as a portfolio manager for the renewables, um, fleet There. And yeah, a whole lot of really old turbines. And it was just so interesting to see that contrast between the new turbines and the old ones and um, and also being a independent service provider, what we could do and what the technicians. So many clever technicians out there on wind farms, just figuring stuff out and, and fixing things that if you tried to do that within the OEM, you get really hamstring Engineers say, oh no, you can’t. You can’t do that. You can’t fiddle with that. Whereas once you’re released from that, for better or worse, [00:05:00] the technicians are just off sorting things out. So that was really interesting to see that contrast. And now I’m with, um, tilt Renewables. So I’m the asset manager for Cooper’s Gap and Silverton Wind Farms. So I’m, I’m now seeing from the owner’s point of view how we actually manage these contracts with the OEMs and with ISPs and how we, how can we do r and m better? Matthew Stead: And from the, um, from the ISP, um, experience, um, compared to your experience now, what are some of the biggest differences that you’ve observed between the old, the other sites and the, and the new site?  Liz Beavis: Yeah, I think it, it’s really just that you’re on your own. Um, so you’re relying on good technicians. To figure things out, you can, you need a parts and service agreement with the OEM, um, so you can reach out to them and ask for support, but they’re, you are the lowest priority. So yeah, you don’t always get information, [00:06:00] so you just gotta be set up to figure things out. But then that does give you the freedom to make changes and to, to fix the things that you’re saying, whereas. Often the OEMs are so, uh, stuck with that mindset of, oh, we, we don’t want people to know we’ve got a serial defect. So we’ll just keep kind of patching things up and hopefully, hopefully no other sites find out about this. You know, instead of just saying, Hey, we know this is an issue, here’s a good way of fixing it. ’cause just all I understand, all of the liability that throws, that, that flows from that, uh, you know. You can’t handle it. Allen Hall: Does that change your perspective, knowing all those things? Do you have a, just a unique background in so many ways where you’ve seen, uh, pretty much all sides of wind operations. How do you think about that now? How are you, are you are addressing contracts differently or are you thinking about the way you staff differently just from your experience?[00:07:00] How does that play into it?  Liz Beavis: Yeah, so definitely from a owner’s point of view. I understand what the limitations are of the OEMs and the ISPs, and so I know, I know what I can push them to do and what I can’t push them to do. And even though you’ve got the contract in front of you and you know it, it says you’re gonna do this, there’s certain things where you, you know, that you need to let it slide because it’s just not reasonable to push it. You just, you just know that they can’t achieve things. Um. But then also going into new r and m contracts, you kind of know what’s critical, what to ask for, what, you know, what, what we need to make sure that we’re getting right from the start.  Allen Hall: How do you sort that out? Because I’ve heard, uh, I’ve talked to many operators. that are doing O&M and they look at the contract much like you, and then they, they look at the contract and go, okay, here’s are the things I can probably get. Here’s the things I can’t get. How did you come to that determination is just because you’ve been so close at all this time? Because I think a [00:08:00] lot of people in wind that are new look at that contract, as the rule of law and you’re gonna get everything in there. But I think the more experienced people realize it’s more of a negotiation or starting point, even  Liz Beavis: particularly, uh, like Comparing construction to O&M I say, construction’s the. sprint and O&M’s the marathon, and you’re in a relationship with this O&M provider for 10, 15, 25, 30 years, depending on your contract terms. So you can’t go in at year three and just have a big fight with each other And you know you, need to, You need to be able to work together. So it’s understanding what the value drivers are on both sides and, um. And focusing on that. So, you know, for us as the owner, we, we just want generation. So even though availability is what
Vestas Withholds Collapse Data, Nordex Iowa and Tariffs
2026/04/07
Vestas hasn’t shared SCADA data after a South Korea turbine collapse, citing an expired warranty. Plus workers at Nordex in Iowa are concerned about tariffs. Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us! Transcript The Uptime Wind Energy Podcast brought to you by StrikeTape, protecting thousands of wind turbines from lightning damage worldwide. Visit strikeTape.com. And now your hosts. Allen Hall Welcome to the Uptime Wind Energy Podcast. I’m Allen Hall and I’m here with Rosemary Barnes. And Fergus is here. Hi. Welcome to our top story. This week is a wind turbine collapse that happened in South Korea at the Changpo Wind Power Complex in Yeongdeok, and the turbine lost a blade. There’s some video here that was recorded when the turbine collapsed, so it happened a couple of months ago, and investigators have been trying to determine the cause of that failure. They’re having a little bit of difficulty because they would like to access the SCADA system of that turbine because that would have a lot of more information about [00:01:00] how the tower was operating at that particular moment. And they’re having trouble in that it is a Vestas turbine and Vestas has not released the SCADA data and it’s citing an expired warranty. Now, Rosemary, this leads to a lot of problems because obviously there’s a ton of sensors in wind turbines today, and they can help determine causes of failures pretty rapidly. But without it, you’re just really looking at video in this particular collapse. Rosemary Barnes It’s amazing that you can look at video. The video is far more useful than the SCADA data is, probably. Um, yeah, it’s, well, I’ve never actually, like, I’ve worked on a lot of RCAs and I’ve never actually got to see video footage of the incident, so that’s actually really cool that they’ve got this dash cam footage. Looking at it now, you can, um, see the lower, probably two thirds of the turbine tower, so you can see the blades coming past. I wish the video would start just like 10 seconds earlier. [00:02:00] Um, because maybe you can see a bit of wobble in the tower. You can see that one of the blades is already missing a tip, or the tip kind of flies off anyway, so maybe it was bent. So definitely looks to me like the root cause was that there was a blade failure. The, um, part of the blade broke off, caused a rotor imbalance, which then meant that one of the blades hit the tower and then it’s really easy for a tower to buckle once it’s got some damage in it. So that, that in itself, like, that’s not an uncommon scenario. Um, and yeah, for sure, like you would ask for the SCADA data, but, uh, I don’t think it’s accurate that they’re saying. There must have been a faulty sensor or something because when there’s a rotor imbalance, it should stop, um, stop the turbine. But I do know from experience, it does not always stop the turbine quickly enough to stop this happening. So, um, I’m not, I’m not sure that the SCADA data would tell you anything [00:03:00] groundbreaking. However, I think it is very interesting Vestas are very publicly not sharing because it’s out of warranty because to me, access to the SCADA data is a key part of being able to operate your turbine safely. And you don’t sell a turbine — like you might sell a turbine with a two year warranty, sure, but that doesn’t mean that you are selling a turbine that can only be operated safely for two years. That’s just like absolutely insane and contrary to — at least a lot of the world’s laws, there’s laws around, you know, how safely you can operate equipment, and especially energy generation assets have specific laws about that. You have to be able to operate them safely and yeah, from what we can see here, like you can’t get access to the SCADA data. So in, in this case, I don’t know if there was a problem with the turbine controller that contributed to this problem. I, I mean, I’m, I’m always a bit surprised that a turbine can shake itself apart and it’s not, you know, there isn’t a sensor in there that can stop it in time to stop the collapse because if you take just the population of turbines that have collapsed, which is, you know, [00:04:00] very, very few from considering the whole global population, but looking at those ones that have collapsed, it’s pretty common way that it happens is from, um, part of a blade falling off and then a rotor imbalance causing the tower to, um, start wobbling and the blades to hit the tower. Allen Hall So would it be in the control laws, Rosemary, where the shutdown would happen in terms of detecting vibration or motion? Maybe swing of the tower? Would that would then drive a safety circuit? Rosemary Barnes At a certain, at a certain level? Um, ’cause all of those, like the rotor does get in a bit of imbalance. The tower does accelerate in, you know, four and a half side to side, that all happens and can happen like quite, quite a lot as well. Like if you’re inside a wind turbine and when they stop it, um, then it makes like a very noticeable shudder right as that stops. And if you do an emergency stop, um, hopefully not while, you know, hopefully you’re not inside the tower when it goes from full, um, operation [00:05:00] to stopping as soon as, as quickly as possible. But that does make a big, um, jump. So, you know, like it’s not shutting down every time that there’s some kind of imbalance or, um, tower acceleration. But yeah, it just, the thing is, it’s, you just, they’re big and heavy, right? And there’s just so much inertia in the system that things can’t happen that fast. Like even if the control system can respond really quickly, it doesn’t mean that it can respond — like it can actually physically stop things before it’s had, you know, even one rotation to hit the tower, um, can be enough. What’s really interesting is that it could be a control system problem, right? That would — that they have now learned. There’s some faulty logic they need to replace it across the wind farm. But Vestas is saying, we’re not gonna tell you if that’s the case or not, because you can’t access this data. And I think that that is really interesting because like I’m constantly frustrated by how little, um, cooperation you can get for root cause analysis and like you can [00:06:00] understand it, no one wants to share their data, but it is in theory covered by laws, at least in, uh, Australian states. You, you know, that you, you’re required to provide information to operate the assets safely for its lifetime. And I, it just, to me is really highlighting that that’s not the case. It’s, it’s not an unusual situation, is kind of what I’m saying. Um, it’s very common that they don’t wanna cooperate, and I’m surprised that they’re happy to say that so, so publicly. Allen Hall Well, the threshold needs to be set somewhere when investigators are looking into an accident like this. I always think you try to help the investigators as much as you can. In the airplane world when there’s an accident, that’s one of the first things that happens is they go pull all the data from the aircraft and then go search through it and see what happened. In the wind turbine world, that’s not necessarily the case, but there is a lot of data at all the OEMs, and it’s not necessarily locked into the turbine. It’s usually remote access, so it would be very easy to give access to [00:07:00] investigators. So it’s, it’s curious to me as to why there’s any hesitation at all if the Korean investigators wanna see the data, just give it to ’em. Rosemary Barnes Yeah. Especially because like from just the brief look that I’ve had, it doesn’t look like it’s gonna turn out that there’s some problem with the turbine controller. If Vestas aren’t to blame, it would be much easier for them to just privately release the data under an NDA and say, look, hey, it’s nothing. It’s not here. But I will say that, um, in the RCAs that I’ve worked on, safety regulators can compel data from the owner and the operator, but it’s not so clear that they have the right to get data from the manufacturer. When you’ve got full service agreements, you can get that because the manufacturer is the operator. But in this case, if Vestas had nothing to do with the operation, then like, I don’t know what the laws are in South Korea, but it is possible at least that they don’t have any right to compel Vestas for the data. Um, for the data. And I think that [00:08:00] is wrong. And, um, this, you know, will hopefully highlight to people, safety regulators around the world — hey, you know, do we need to be changing this regulation a little bit to make sure that when you sell a wind turbine, or you know, any, anything else, any other big bit of industrial equipment, when you sell it, you have to — you have to provide enough information for the life of the wind turbine to operate it safely. Doesn’t mean you need to give away all your trade secrets, but it needs to be safe. And part of that is when you have a catastrophic failure, you do need to make sure that this is not gonna repeat itself across the whole wind farm or across, you know, every turbine of this type in the world. That’s why you do a root cause analysis after the fact. Like you’re not saving this turbine. It’s in like absolute pieces on the ground, right? Like the most value you’ll ever get out of this turbine again is probably recycling the steel. Um, that’ll be the
Quebec Wind Boom, Aikido’s Floating AI Platform
2026/04/06
Allen covers Quebec’s record wind project, Madawaska’s financial close, Nova Scotia’s first direct-to-consumer wind sales, PEI’s retiring wind farm, and Aikido’s floating offshore AI data center. Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us! Transcript Good Monday everyone. Canada is building. On the last day of March… the province of Quebec broke ground on the largest wind energy project in Canadian history. It is called Des Neiges… French for “of the snows.” One hundred and fourteen turbines. Two hundred meters tall each. Seven megawatts apiece. When the first two phases are complete… those turbines will power one hundred and forty thousand homes. The partners are Boralex, Énergir, and Hydro-Quebec. The investment: three billion dollars. Quebec Premier Francois Legault said it plainly at a recent ceremony: “There is a global race right now to dramatically increase electricity production.” He is not wrong. Also in Quebec… the Madawaska Wind Energy Project just reached financial close. EDF Renewables and Hydro-Quebec are behind that one. Two hundred and seventy-four megawatts. Forty-five turbines. Financed under Green Loan Principles. Expected to power more than forty-four thousand homes. Now… across the Gulf of Saint Lawrence… Nova Scotia is launching the Mersey River Wind project. One hundred and forty-eight-point-five megawatts. Thirty-three turbines. And here is where it gets interesting. For the first time… consumers in the province will be able to buy electricity directly from a wind farm. Not from the utility. From the source. A company called Renewall Energy is already signing contracts with homeowners… businesses… even the city of Halifax. And then there is Prince Edward Island. That province is saying goodbye to its very first wind farm. North Cape began in two thousand and one. Sixteen turbines. Each rated at just point-six-six megawatts. The province’s newest turbines? Four-point-two megawatts each. The P.E.I. Energy Corporation is seeking bids for an environmental impact assessment… the first step toward replacement. Twenty-five years ago… North Cape was a pioneer. Today… it is showing its age. That is how progress works. But let us end on this. Out in California… a company called Aikido Technologies has unveiled a floating wind platform… that also serves as an AI data center. The platform pairs an eighteen-megawatt turbine with onboard computing power… cooled by the surrounding ocean. A prototype is being built in Norway. Commercial launch: the United Kingdom… twenty twenty-eight. The CEO put it simply: “Before we go off-world… we should go offshore.” So… from Quebec to Nova Scotia to Prince Edward Island… Canada is building its energy future at full speed. And somewhere out on the open ocean… someone is building the next chapter altogether. And that is the state of the wind industry for the 6th of April 2026. Join us tomorrow for the Uptime Wind Energy Podcast.
Wavepiston Brings Wave Energy to Island Communities
2026/04/02
Michael Henriksen, CEO at Wavepiston, joins to discuss wave energy’s advantages for island communities, the company’s hydraulic piston system, offshore wind co-location, and the Barbados pilot project. Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us! Welcome to Uptime Spotlight, shining light on wind. Energy’s brightest innovators. This is the Progress Powering tomorrow. Allen Hall: Michael, welcome to the program.  Thanks, Allen. A pleasure.  Allen Hall: Well, this is gonna be a, a really interesting discussion today because, uh, I don’t know a lot about wave power, but. Obviously the world has made some substantial progress in wind and solar, but the ocean energy is still relatively unknown and. I want you to, just to paint the picture of the problem, what gap exists in renewable energy today that wave energy can fill? Michael Henriksen: Thanks. Thanks. A yes. Uh, that’s right. So ocean energy as such. And we have, um, we are working with the wave energy side of the other things here in Wave Piston has a very large potential because there’s a lot of waves around us. We all feel it when we are out in the sea, when we’re out swimming or whatever.[00:01:00] So what can it fill out that is that, that the, the interesting thing about wave energy is that is, um, timewise shift compared to wind. You know, it’s the wind that builds up the waves. The waves come, uh, the wind comes and goes, but the waves that keep rolling also afterwards. Yeah. So this timewise shift that gives some extra value. Of the energy that you can actually produce at the same time, it’s actually also, it’s a more of stable resource. So you, you don’t have these large fluctuation, it, it, it comes slowly and then dies away slowly depending on where you are in the world, of course. And then the last for the least is it’s very predictable. So stable days advantage, you can actually very precise predict what sort of your energy production profile. So by adding an extra renewable energy source, you can actually sort of, it gives extra value to both have sort as much solar PV as possible, as much wind as possible, but also have wave energy there to have sort of a better, uh, in the end, uh, [00:02:00] uh, energy production. Allen Hall: Yeah. And that, and the technology is really applicable to, uh, a lot of regions, uh, around just like island communities and places of a little more remote. Uh, because the cost of electricity on islands is incredibly high. They’re buying diesel usually, and they have a kind of a, a double problem in that they have to buy diesel to run electricity plants, and then at the same time they’re, they’re having to make fresh water all the time ’cause fresh water’s a problem. Wave Piston solves both of these problems together. But why are we in this? Space right now. I, I just wanna back up a minute. I mean, there, there does seem like for the last 30, 40 years that I can remember, the island communities have been really stuck. Solar hasn’t really filled the void. Wind has been intermittent option at times. Why waves?  Michael Henriksen: Yeah. But that’s actually, uh, where we see our, like our step to, uh, [00:03:00] you know, uh, go to market strategy, so to speak. See, that is the first step because as you mentioned, all the island communities, I would also say remote coastal communities still have this, this challenge of being dependent on fossil fuels. And as you know, it’s, it’s mainly because of course you have limited, uh, uh, uh, land space. Uh, of course they should have as much solar PB as wind as possible, but you still have this, you know, you don’t wanna have it in your backyard. It’s difficult to have, you know, spatial beautiful islands where you have, uh, tourism, et cetera. And then you have, uh, solar PB and winter turbines all over the place. It’s not gonna happen. So they’re looking at to go to, of course, offshore. What they have a lot of us is they have ocean. Yeah. And the challenge there again, is. Most places when you go just a few kilometers from shore get very, very deep. Yeah. So you need to find something that is sustainable, something that it will not spoil the view. Something that is actually, uh, uh, an [00:04:00]environmental friendly way, you know, of harnessing the energy that that is where wave energy come into the picture because. It’s happening below the sea. So the, the surface and, and, and the, it can sort of coexist with other things happening there. Of course, you need to have an area where just say this is for wave minute. Yeah. But you don’t, so sort of spoil view. You don’t have this issue with the, not in my background as such. So, so, so by coming in, of course we will be at another cost level to begin with. Yeah. By coming in, taking that part of it, then we can actually be a part of solutions for these remote islands and the coastal communities. Allen Hall: Well, because some of these islands are spending more than 10% of the GDP just on energy to import it. That’s. Really high and a, on a big burden on the economy is how do you see wave piston affecting that?  Michael Henriksen: But it’s just actually that is this, uh, it’s, it’s both, you know, in the first phase, of course, the islands in milk richi, but also you can say [00:05:00] countries as such that are dependent on fossil. Because you can just reduce your dependency and also these volatility of the price. Uh, but, but go coming back to wave piece, of course we, uh, the special thing about our system is that we actually, we can both produce electricity and we can also desalinate sea water ’cause it’s hydraulic system. So this about coming into an island community where they have both these challenges. We can actually come with a double. Sort of a, uh, solution and then, uh, work with how much energy you need, how much water you need at a given time. It could be an off grid solution or an on grid or micro grid, whatever, where, where, where. That makes sense. Yeah. So coming in and that’s actually why there is a big uh, uh, sort of. Focus on wave, not only on us, but also others in the sector, that we can be a part of the solution, which is actually when you come with a new thing, you need to sort of to say, okay, this is new, this is fantastic. But you also need to say, okay, we are part of the solution now. We are solving some of the problems you have. We’re not [00:06:00] creating new ones. Or maybe you not, not, there’s always some challenges, but we are not creating that many of big ones. You know? We are solving things. Yeah, we’re solving. Your challenges?  Allen Hall: Well, e even if you look beyond the island, island economies, uh, there’s a bigger picture here about renewable energy sector that is not really considered wave energy too much, especially for offshore wind, right? There’s, uh, uh, offshore wind, particularly in the North Sea and off the coast of England and other places where there’s our massive wave resources. We haven’t really addressed that at all. Are we missing out on a, on a lot of energy production? That would be relatively easy to go get.  Michael Henriksen: We are missing out. That’s the, the, the short, the short, uh, uh, answers there. Of course, we see relatively easy need to look at the relatively side of it because it is difficult going offshore. You know why? But it’s also why I’m asking. It’s actually why it hasn’t wave energy succeeded so far. Well, that’s simply because it’s [00:07:00]not the low hanging fruit. Now being able to take a wind turbine. You know, in Denmark it was the farmer. You could just go, or the local Smith blacksmith go, go and fix things. Now we need to go offshore immediately. You didn’t throw the wind turbines in the middle of the North Sea in the first place? No. So this of course, solving the issue with. The survivability someplace. Sometimes you have really extreme large weight, large, uh, forces you need to work with. You have your ability, you know, you have this, that, that there are millions of cycles in the corrosive, uh, environment. So all that of course you need to, uh, design the system to handle and still being able to, you can see through cost trajectory will get you down to, to a competitive cost limit. So of course, yes, we’re missing out. Uh. There is a large, uh, uh, sea space, especially in the, all the newer, uh, offshore wind turbine areas because they take up a lot of space. They have very large, beautiful wind turbines, but you have a large sea [00:08:00] space in between where you can actually use that for energy production. So, so yes. That’s, uh, definitely a large of opportunity.  Allen Hall: Well, so let’s talk about what Wave Piston has built. Can you walk us through what the Wave Energy system does, kind of how it works in simple terms and what makes it different from some of the earlier Wave energy devices that have been tried over the years? Michael Henriksen: So, so we, uh, in Wave Piston is actually going a bit back to the, the whole old style. It was not me actually, that’s the clever one There is by colleagues in, in, in, in Wave Piston. So, uh, but they, they was general analyzing. What are the, the challenges, you know, or has been the challenges, uh, on, on Wave 80. Why haven’t we succeeded so far? And it, what they came up with is actually this brilliant concept we have now that is so hard so far, not so. Put it in a, in a labor perspective. Something also I und
UK Bans Ming Yang, Vestas Plans Scotland Factory
2026/03/31
The UK bars Ming Yang on security grounds while Vestas announces a €250M nacelle factory in Scotland. Also, Nordex reaches a 199-meter hub height milestone and male bats use turbines as courtship song perches. Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us! [00:00:00] The Uptime Wind Energy Podcast brought to you by Strike Tape, protecting thousands of wind turbines from lightning damage worldwide. Visit strike tape.com. And now your hosts. Allen Hall: Welcome to the Uptime Wind Energy Podcast. I’m your host Allen Hall, and I’m here with Rosemary Barnes, Matthew Stead, and Yolanda Padron. And. The hot news this week is Scotland, and Scotland is gonna be a major hub for manufacturing for all the offshore wind that is happening in the UK and around Europe. Well, the UK government ruled that Chinese turbine maker Ming Yang poses a national security threat and blocked its products from UK offshore wind projects, which in turn killed a plan for a one and a half billion pound Scottish factory. And then a couple of hours later, Dana Danish Giant Vestus announced plans to build its own cell [00:01:00] and hub factory in Scotland with an investment of about 250 million euros and up to about 500 jobs. Uh, but there is still a catch. Vestus is only going to move forward if it wins enough orders from the UK’s offshore wind. Auction program and allocation round eight was announced recently, so that’s gonna happen. So obviously Vestus would like to win a number of turbine orders from that, but that’s a pretty major announcement by the UK and by Vestus. It does seem like Vestus will be the leader in offshore winds in the uk. Is that the long term play now? Is that there’ll be a primary. Wind turbine source for the uk and that would be Vestas.  Rosemary Barnes: Weren’t we just covering, didn’t we just cover last week about another Danish manufacturer who just closed in a cell, uh, manufacturing facility in Denmark? Allen Hall: Siemens did.  Rosemary Barnes: So yeah, one week [00:02:00] Siemens is closing a factory in Denmark and the next week. As Bestus is opening similar factory in the uk. So that’s a interesting little geographic, uh, bit of information,  Matthew Stead: isn’t it? Thanks to our friends, the royal family in the uk, that they’re really promoting offshore wind. Matthew Stead: Uh, my understanding is they own the rights to the offshore water. Uh, well, obviously the offshore, offshore area, and they, they have promoted, um, the use of leases. And I, I understand, I might be cor incorrect, that the royal family is the one that may gain the, the benefit from the leases.  Allen Hall: It’s the crown of state in the UK that. Manages the royal family’s holdings. [00:03:00] Some part of the awarded amount or the, the leases are going to go to the royal family. I forget what that number is. Maybe 10% of ’em. And the rest basically are the treasury of the uk.  Matthew Stead: Oh, not all of it.  Allen Hall: Yeah, not all of it. But yeah, I mean it definitely benefits the royal family.  Matthew Stead: Yeah. So kiosk to the royal family for promoting it.  Allen Hall: Well, the price of petroleum in oil products recently has skyrocketed, of course. And, uh. The push to get renewables as the leading source of electricity generation in the UK is a massive move, which will. Promulgate all through Europe, everybody’s gonna be on that same pathway, I would think. Right now, the, the, the unique part about the UK and these, these Scottish efforts is that the speed at which the UK and Scotland in particular are going after it, you see some commitment by the Scandinavians in Germany to get to some of these numbers. But, uh, the UK is putting in an action. And they have a in, uh, industrial growth plan, which [00:04:00] is a little bit unique that this is part of the growth strategy of the UK is they’re trying to grow jobs, they’re trying to get higher paying jobs into the uk and this is the, the one way they’re trying to accomplish it. I was listening to a podcast today talking about this. It was someone representing, I think it was great British energy, but they are at least the, as the discussion points, they were trying to show comparisons. To what will happen and when to What has happened in the past with aerospace that the UK realized it’s good at composites, manufacturing wings, doing power plants, rolls Royce is there, right? So there’s a number of parallel. Tracks that the UK is going to to try to do through, um, their knowledge of aerospace into the wind turbine market. We’ll see if that comes to fruition. I’m not sure where these vestus turbine blades are gonna be built. They’re gonna be V 2 36 turbines, 15 megawatt machines out in the water. I, I assume that the turbine blades are gonna be coming from outside the [00:05:00] uk, but maybe the UK is working on something with Vestus about that.  Rosemary Barnes: I don’t know, but, but the UK government with their auctions has definitely laid the framework that would enable manufacturers to make that sort of investment or that, that sort of investment decision. So it wouldn’t, wouldn’t surprise me if we saw more manufacturing there. They’ve got, you know, the most secure, uh, and long, long term pipeline, more the most visibility around. Future projects. So if I was a company looking for, you know, where am I gonna open another factory, that would probably be quite appealing. That security really helps when you’re planning out a factory to know that you’re highly likely to have orders filling it for, you know, the lifetime of the factory. Even if costs are a little bit higher, I think that it would be, you know, you can offset a certain amount of cost by. The certainty.  Allen Hall: What are the short term ramifications for Chinese wind turbine manufacturers in Europe? Are you gonna see [00:06:00] more of these type of moves like the UK just did today, where they’re gonna put some prohibitions in? Or will there be some places that, uh, Chinese manufacturers can set up base?  Rosemary Barnes: To me, it’s really strange because it’s, it’s like you’re worried about security, so you don’t let them come bring their technology to your country. It’s. Like the, to me, the obvious thing is the other way around. If they’re worried about, um, technology transfer and IP theft, that they, um, should have prevented European wind turbine manufacturers from sitting up factories in China, because surely that’s how the big transfer of knowledge happened. Now China, you know that that’s where, that’s where they learn how to make win winter turbines 10, 20 years ago. Um, and what they’re doing today in China is, is not, it’s not like static from that. They have also developed their own, you know, their own ideas and taken the technology in a different direction. Why don’t we take the opportunity to learn from that? I, I find it a bit, [00:07:00] a bit funny that, um. Yeah, that you would ban a manufacturer from coming to your country because you’re concerned that they have, um, you know, copied or stolen your technology in the past and can’t see how they’re gonna do that by bringing their tech to your country. Matthew Stead: And how does that tie in with the discussion we had the other week about the tariffs and removal of tariffs on certain components? Um, Alan, do you know if that’s linked at all?  Allen Hall: I don’t think it’s linked. There hasn’t been any news articles about it. However, there’s gonna be a lot of hard choices made about where components do come from. That does seem like the UK government is thinking about what components can be made in the uk where UK engineering and technology can be applied to, to change the marketplace and where they want to go buy components. Uh, are they gonna buy them from China or are they gonna buy them from Poland or somewhere in Eastern Europe or somewhere in South America? There’s a lot of places to buy components today. Or India. I think India is obviously, uh, one of the top choices, [00:08:00] right? Just because it was a colony years ago. And there’s a relationship there between the UK and India. Is that where the technology transfer begins? Uh, instead of it with China? Probably so delamination and bottomline failures and blades are difficult problems to detect early. These hidden issues can cost you millions in repairs and lost energy production. C-I-C-N-D-T are specialists to detect these critical flaws before they become expensive burdens. Their non-destructive test technology penetrates deep into the label materials. To find voids and cracks. Traditional inspections completely. Miss C-I-C-N-D-T Maps. Every critical defect delivers actionable reports and provides support to get your blades back in service. So visit cic ndt.com because catching blade problems early will save you millions.[00:09:00] Alright, how tall is too tall? Well, for onshore wind, the answer keeps changing with. Nordics group just receiving its first order for a turbine with a hub height of. Drum roll please. 199 meters. So there must be some sort of limitation at 200 meters is where the limit is. So they came in one meter below it. It’s what it smells like.  Rosemary Barnes: The limitation would be on the tip height, not the hub height.  Matthew Stead: Should have been 200,  Allen Hall: just routed up to 200. See?  Rosemary Barnes: Yeah. But this is Germany, right? Where it’s lik
Britain Breaks Wind Record, Ørsted Exits Floating Project
2026/03/30
Allen covers the UK’s all-time wind record, the Crown Estate’s new 6 GW leasing round, Port Talbot’s floating wind assembly port, and Ørsted and BlueFloat’s exit from the Stromar project. Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us! Good Monday everyone! Last Wednesday, the British Isles did something remarkable. Wind turbines across the United Kingdom generated twenty-three thousand eight hundred and eighty megawatts of electricity — an all-time national record. That is enough to power twenty-three million homes at the same moment. And while wind was hitting its record high, natural gas fell to just two-point-three percent of total British supply. A two-year low for gas. In a single day. Britain is not stopping there. The Crown Estate has announced a new offshore wind leasing round, targeting six gigawatts of new capacity off the northeast coast of England — enough to power six million more homes. And now the United Kingdom is building the physical infrastructure to match that ambition. Ministers have committed up to sixty-four million pounds in support for Port Talbot in South Wales. The plan: the UK’s first dedicated assembly port for floating offshore wind. Associated British Ports says total investment could exceed five hundred million pounds once fully built out. The goal is the Celtic Sea, where developers are targeting four gigawatts of floating wind. Four gigawatts. Floating. In open ocean. Floating offshore wind is the industry’s next frontier. But it is also the industry’s most expensive and complicated technology. Consider what happened quietly this last week off the coast of Caithness, Scotland. Ørsted, the world’s largest offshore wind developer, and BlueFloat Energy have both walked away from the Stromar floating wind project. Stromar is a one-point-five gigawatt floating wind farm — sixty to one hundred meters of water depth, fifty kilometers offshore, enough power for one-point-five million homes. Construction was not expected to begin until twenty twenty-eight. Now Nadara, the project’s remaining partner, holds one hundred percent of Stromar alone. For Ørsted, the exit signals tighter capital discipline. For floating wind, it signals just how difficult the economics remain. And yet, across the North Sea, a solution is taking shape. The University of Strathclyde and Japan Marine United signed a Memorandum of Understanding last week. Their mission: standardise and mass-produce floating offshore wind turbines. Japan Marine United has been developing floating wind technology since 1999. Their Jade Wind floater is headed for large-scale government-led deployment in Japan. Standardisation — the same answer that made fixed-bottom offshore wind competitive. So here is where we are. Britain just broke its wind generation record. The Crown Estate is opening new ocean for development. Port Talbot is becoming a floating wind assembly hub. And Strathclyde and Japan Marine United are building the engineering knowledge to make it all affordable. Two companies stepped back from Stromar. But the Celtic Sea is still waiting. And that’s the state of the wind industry on the 30th of March 2026. Join us tomorrow for the Uptime Wind Energy Podcast.
Aerones Robots Scale LEP Repairs Across the US
2026/03/26
Dainis Kruze and Janis Putrams, co-founders of Aerones, welcome Allen to their new Denton, Texas facility to discuss robotic spray-coat LEP repairs, third-generation internal blade crawlers, and their US-made inspection drone that eliminates Chinese components. Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us! Welcome to Uptime Spotlight, shining light on Wind. Energy’s brightest innovators. This is the Progress Powering Tomorrow. Allen Hall: Dainis and Janis, welcome back to the program.  Dainis Kruze: Thank you, Alan, for visiting us, uh, in, in our new facility.  Allen Hall: Yeah. Is a great new facility. We’re in Denton, Texas, which is just north of Dallas. Uh, and you move from. Lake Dallas area. Mm-hmm. And we had visited that facility a year or so ago. This new facility is amazing. It’s what, probably four times the size. Yeah. Maybe a little bit bigger. And it is, uh, indicative of the growing business that Aeros has in the United States. And that’s wonderful. Uh, and I’m glad I could catch you in Texas ’cause I know you, you guys are running around the world all the time. Uh, I think the last time I was at. A facility with both of you was over in Riga?  Dainis Kruze: Yes.  Allen Hall: Uh, probably two years ago now. Oh,  Dainis Kruze: yeah.  Allen Hall: So I saw the Riga operation and, and now we’re seeing [00:01:00]the, the Denton US operation. You have facilities in other places too, right?  Dainis Kruze: A small one in Australia, but, but yeah, the main facilities in Riga and the second biggest one here in, in Dallas. Allen Hall: A lot of technology changes since Rose Riga. Uh. Leading edge being the big one, leading edge protection materials. And when I talk to US operators, even operators in Australia, we’re just there. They love the idea and the application of a robot for leading edge repairs.  Dainis Kruze: Oh yeah,  Allen Hall: it makes total sense. It’s one of those areas that, uh, Rons has shown you can do this with a robot much more consistently. Has that business grown quite a bit since you first started it?  Dainis Kruze: Oh yeah. Oh yeah. We did more than 500 turbines last year, so we. The plan for this season is about one and a half thousand turbines, so it is growing quite a lot.  Allen Hall: So the, the speed and the quantity of robots here in the United States is must have grown considerably. Dainis Kruze: Oh, yeah. Uh, one team now gets [00:02:00] up to 15 turbines a month. So if it’s category one or two turbine, uh, leading edge, uh, erosion, it’s about one day to do one turbine category three. Uh, one turbine is being done in two days, and we are talking about like 12 meter repair. It’s not a spot repair, it’s a full repair, like  Allen Hall: full repair. Okay.  Dainis Kruze: Yeah.  Allen Hall: And the robot technology and the, the amount of technology on the robot is behind us has grown quite a bit. Uh oh. Yeah. You’re learning as you’re going. Obviously. I looked at a number of robots in at the Denton facility. Smarter robots. More data, more consistency. Particularly because the leading edge protection materials require a lot more care than rope technicians can generally create on site. Right. Walk us through what this robot is doing, why it’s doing what it’s doing, and, and like the, the quality you get coming out of it. ’cause what I see behind me is really nice. Better than, than [00:03:00] what I’ve seen typically coming out of a factory.  Janis Putrams: Yeah. So multiple things actually we’ve been. Kind of what we’ve been hearing sometimes is that, um, that material’s good, the application seems good, but then it comes off after some time and you don’t understand what’s what happened, right? Yeah. So we understood to, to make it right. We need to make sure that both the kind of, we take the full ownership for the, for the whole process, for the application. And so we’ve been investing quite a lot in our lab to, to actually understand what the material needs, how the surface needs to be, be prepared. How do we measure it? How do we make sure the process is right? So actually what we saw is that, yeah, making sure adhesion, uh, is, is right, is is very important part. Also, when you go out there, there’s a quite a spectrum of the weather forecast, like information. You have humidity, you have temperatures, and you need to be able to guarantee the, the, yeah, the output in all of that spectrum. So yeah, we’ve done quite a lot on, [00:04:00] uh, on those. And  Allen Hall: so from a technology perspective, you’re incorporating all those measurements actually into the robot. So you know what the temperature was when the application was made, you know what the humidity was, you know what the mixture was exactly. Remember the temperature of the, the ingredients that went into make the, the LEP material. That’s remarkable. And now it’s, uh, I think a lot of people think of LEP as being something you would apply with a, you see it still, you see it with rollers and sort of. Basic human tools. You’re spray coating today. Yes.  Janis Putrams: Yes.  Allen Hall: And the, the smoothness of that coating is remarkable.  Janis Putrams: Yeah. For example, I dunno if you, if you know in factories where the cars are made Yeah. You don’t see people rolling the car. Yeah. So, because the, the spraying technology, it enables us to actually guarantee the robot when it moves, it moves in a constant speed. It’s not manually, it’s kind of on a cruise control. So it’s, it’s moving in a constant speed [00:05:00] and the spraying is constant. And so yeah, the, the thickness is, is, is always the same. And also it kind of nicely tempers off on the, on the sides. So there’s no vortexes, kind of, no aerodynamics loss. Uh, so yeah, it, it comes out very, very nice and  well.  Allen Hall: That’s the thing about when you put a leading edge coating on, a lot of times there’s a taped edge or a hard edge there. And then they gotta come back and try to fill it. Or maybe they don’t fill it and the filler doesn’t stay. It may. I’ve seen all varieties of that. So when you spray coat it, not only do you get a very smooth finish, aerodynamically, you lose the step on the backside. Right. So the, the entire assembly is, is just more aerodynamic. And that’s the reason you’re doing in the first place. Mm-hmm. It’s not just we’re recovering this shape. Yes, you’re recovering the shape, but you’d like to get some more power outta your, your turbines. That makes sense to me. When you’re, uh, cleaning the blade too. There’s a lot of technology about just getting the blade prepped because we’ve seen so many times where a leading edge coating’s been applied to a very [00:06:00] poorly prepped blade surface, and it just doesn’t stick. A year later, you’re out doing it again. Describe what you’re doing on the prep side.  Janis Putrams: Yeah, so what we also see, uh, saw that, um, if there’s some damaged material, it’s very important to get it off. If you put it on top of the damaged material, it’s just not gonna hold. So we have one of those robots, it has quite a powerful kind of belt sanding tool, uh, where you can truly take it off. And then the second tool prepares the surface and also the tool kind of makes sure that it’s not up to the, to the operator to choose which point to, to prepare, but just the tool goes in, in a single step and prepares all of it so we can kind of. Be sure that nothing’s missed. And then when you, when you put it on, uh, then, then what’s gonna, it’s gonna hold. Dainis Kruze: And to develop that tool. We have a laboratory where two chemical engineers are actually working and testing and doing pulley tests and surface, uh, adhesion tests [00:07:00] and, uh, to get the result, the best result possible. Because, as Ian said, we’re taking, we, we are giving guarantee, uh, of our work. Uh, and we don’t do that. Oh yeah, it peeled off because the material was bad. We, we, we take the guarantee of application and materials that it’s gonna be stick, uh, is gonna stick and it’s gonna stay there.  Allen Hall: I think there’s a lot into that. And having been to the Riga facility, I understand you have a lot of capabilities there. When we talk to. Independent service providers and they’re applying materials. They’re not doing all the research. Oh, yeah. That aone is doing. You, you are actually looking at material properties, you’re looking at surface conditions, you’re looking at the chemical reactions that are happening. You’re doing the mechanical pull test. You’re putting engineering behind it. Oh, yeah. Which, which has to happen. We’re still early in this leading edge protection world. We have, we don’t have 50 years of experience. We have two or three really good years, and we’re still learning and there’s a lot of different materials being proposed right now. That mechanical testing and evaluation [00:08:00] laboratory really raises the bar.  Dainis Kruze: Oh  Allen Hall: yeah. I think in terms of just what you’re expecting to get out and, and EC saying, you back up what you do. Oh yeah. Which is completely different than the rest of the industry. De describe what that means to an operator that chooses their owns to do leading edge protection. Dainis Kruze: Yeah, it’s a turnkey, uh, solution, right? So, uh, you won’t get in a situation when, um,
Danish Renewables Push in Australia, Nearthlab Does Defense
2026/03/24
Denmark’s royal trade mission brings 54 companies to Australia’s renewables market. Plus the UK opens CFD allocation round eight for up to 18 offshore wind farms, and wind tech startups weigh focus against diversification into defense. Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us!  The Uptime Wind Energy Podcast brought to you by Strike Tape, protecting thousands of wind turbines from lightning damage worldwide. Visit strike tape.com And now your hosts. Allen Hall: Welcome to the Uptime Wind Energy Podcast. I’m here with Yolanda Padron, Rosemary Barnes at Matthews Stead, and we start off. On the Danish trip to Australia, 54 Danish companies traveled to Australia alongside King Frederick II and Queen Mary. Uh, over the past week, most work in the renewable energy and green construction businesses that traveled along several signed agreements during the trip. Denmark sees Australia as a growth market, and Rosemary is tied to royalty here. Loosely that Queen Mary is actually from Tasmania, much like Rosemary. [00:01:00] So there is possibly a line to the throne, the Danish throne for Rosemary.  Rosemary Barnes: My dad’s from Tasmania. I, I live in Canberra, but I was, the whole five years I was living in Denmark, I kept waiting for Princess. She was Princess Mary at that point, but Princess Mary to get in touch with her phone number, catch up. You know, Australians have moved to Denmark. Never happened. And now I see that they’ve come to Australia. And do you think that Mary reached out and got in touch with me? No, she didn’t. So I continue, continue to be disappointed in, in Queen Mary. Matthew Stead: Maybe she’s waiting for you, Rosie.  Rosemary Barnes: Yeah, she could be waiting for me to reach out. That’s true.  Allen Hall: But I clearly, Australia is a growth market. Denmark sees it. I know there’s been a number of Danish companies in Australia over the last two, three years, or con companies from all over the world have been down to Australia, realizing that the growth of renewables is gonna be big because Australia is targeting 82% renewables by 2030. Uh, and right now it’s about 50% renewables, which is [00:02:00] remarkable by the way, that connection to Denmark. Is only going to grow, especially with the relationship with Queen Mary to the area. What are some of the growth areas that Denmark can walk into in Australia right now, Matthew?  Matthew Stead: I mean, obviously the proposed offshore wind is a, is a big thing. So, um, once that gets up and running, obviously the Danish technology will come in there. Um, but, but also, you know, through vest have been here forever. Uh, Siemens, gaa, you know, there’s a strong Danish connection there. Um, so. Yeah, I, I think it’s already, already, already really strong. And, um, obviously having the, the queen, the Danish queen, um, yeah. Ties in with all of that.  Allen Hall: Is it a reciprocal agreement that Australians can do work in Denmark?  Rosemary Barnes: I don’t think, it’s not any sort of like free trade agreement, is it? It’s just some individual, I dunno how much we’ve, we’ve got to [00:03:00]teach Denmark, although there are some good Australian technologies, like maybe not building wind turbines themselves, but there are some good technologies like here, logic’s Ping, uh, Australian developed the ping part of it anyway. And then also, you know, I think some, some future manufacturing methods, uh, doing some exciting things here in Australia. Also, it’s not that hard to move to Denmark if you, um, like when I moved there, all I needed to get a Visa was a, a job offer. That was a certain, I, I don’t think it, I don’t, I don’t remember exactly if it was the type of job or if it was the salary, but you know, like you’re not gonna get a job offer. Like working part-time at a bar isn’t gonna be enough to get you a, a working visa in Denmark. But certainly. Any engineers, um, you can, if you get a good engineering position offered to you in Denmark, it’s not hard for the company to make that happen. So I don’t know that we need, we don’t, we don’t really need it made that much easier for us [00:04:00] to get over there. Allen Hall: Is it difficult to get a work permit in Australia if you’re from Denmark?  Rosemary Barnes: Yes and no. It’s not like I would so love to be hiring my XLM colleagues to come. I know that I’d moved to Australia too. Some of them, it’s, it’s not super duper easy. Um. It’s not impossible. And uh, if people are young enough, it’s a bit easier. But, um, it’s, it’s definitely possible, but it’s not, it’s not straightforward. It’s quite expensive and lengthy process.  Matthew Stead: You know, if they can fund a fund, um, themselves with a couple of million dollars, that’ll make it easier.  Rosemary Barnes: It’s definitely beyond my capabilities as a small company of like four, four people to be able to, um, sponsor someone. But I have had, um, actually. Most, maybe. Yeah. Every single employee actually that I’ve had has been, has non, not an Australian citizen, but they’ve all had visas for other reasons. You know, either because they came over with a partner who, um, was an unskilled working visa or because they did a master’s [00:05:00] here and then got a, um, a, yeah, after that got permanent residency through the, you know, the, there’s a pretty established pathway after studying to be able to get permanent residency. Definitely appreciate that there is so much, um, international talent that’s willing to come to Australia, but just yeah, unfortunately any, any random skilled person, you, it’s not, it’s not easy for a small company to bring them over.  Matthew Stead: Rosie, would you recommend Australians to go to Denmark to learn about the wind industry and then, and come back again like you did? Rosemary Barnes: I recommend that they do that in 2016 when I did it. Um, so everyone who’s got a time machine. Hop, hop in, hop in your time machine and go, go do that. I mean, it’s, uh, I was looking back through, um, photos, uh, of my time there recently and was just, uh, like thinking about how much work I did and the amount of time that I spent like in, in production is like I got in my. Four years that I was working for lm, I had at least 10 years worth of experience. And I mean there were [00:06:00] some long, long weeks, but I’m not sure that Denmark’s the right place now because for LM there’s nearly no engineering left in Denmark and certainly not doing the cool, new, exciting technologies that they were while I was there. So that’s not the go Vestas is still doing a fair bit. But you know, we talked recently about the Vestas CO wanting to, wanting to move somewhere with more favorable. Taxation of CEOs salaries. So, you know, maybe that’s not continuing. So I definitely recommend moving to another part of the world early on in your career while you’ve still got enough energy to, to, to like really, really hard work. Um, but I dunno that Denmark is, is the right place anymore. There’s not that much manufacturing left Now.  Based on your experience in both Denmark and Australia, how likely do you think that any of these companies that are coming in. To Australia will do any r and d with data from Australia for all of these wind technologies that they’re bringing. Rosemary Barnes: I, I think that there’s some interest in that. I haven’t heard [00:07:00] Danish companies specifically. I have heard a few little inklings of US companies who are interested and I think that that makes a lot of sense because the US was a much more attractive environment for wind energy technologies until a couple of years ago. So there’s a lot of companies that got partway and now are frustrated and I think that Australia seems quite attractive to them. So that’s where I’ve heard people interested, maybe British as well. Um, the Denmark Danish companies would do well. Like any company, um, that’s trying to develop a technology related to wind energy would, um, do really well to come try and develop in Australia because, you know, like, um, we’re so short staffed or like for expert staff. Things are really spread out. Costs are very high. Um, things wear out faster. Like we just have more operational problems here. So, you know, when you’re putting a business case together, you need to, um, you know, an environment where you are. The alternative of just doing everything manually is [00:08:00]far more expensive here, and it takes far longer so you can get a much more positive business case, um, in Australia, like earlier than you could somewhere else. So I think that that makes it really. Really like perfect place to develop technologies. Um, yeah, but I don’t think everybody realizes that yet. But I do see some, some people starting to,  Matthew Stead: and I’m adding to what you’re saying, Rosie, when I first started in wind, um, back in 2012, um, I got great reception from Denmark. Actually, I probably got the most. Positive responses to my outreach from Denmark. So, um, I, at that point in time, you know, it is a little bit before 2016, but, um, um, um, I, you know, I found really positive engagement and willingness to be open to new technologies. So that was my experience  Allen Hall: as Wind energy professionals. Staying informed is crucial, and let’s face it difficult. That’s why the Uptime podcast recommends PES Wind Magazine. [00:09:00]
UK Unlocks 10 GW Offshore Wind, Revolution Wind Powers Up
2026/03/23
Allen covers Britain’s radar fix unlocking 10 GW of offshore wind, Revolution Wind delivering first power off Rhode Island, typhoon-proof turbines rising in the Philippines, and an Iowa bill to dim turbine lights at night. Sign up now for Uptime Tech News, our weekly newsletter on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard’s StrikeTape Wind Turbine LPS retrofit. Follow the show on YouTube, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary’s “Engineering with Rosie” YouTube channel here. Have a question we can answer on the show? Email us! This is Uptime News Flash. I’m Allen Hall. Here’s the wind energy stories you need to know. For years, offshore wind developers in the United Kingdom ran into an invisible wall. Not weather. Not financing. Radar. Military air defence radars could not distinguish a wind turbine from an aircraft. So certain stretches of British waters were simply off-limits to offshore development. Not anymore. The UK government has purchased specially designed air defence radars built to coexist with offshore wind farms. Installation begins in early 2029. Ten gigawatts of previously blocked offshore wind capacity, now unlocked. That follows the largest single offshore wind procurement in British and European history — 8.4 gigawatts, at a price forty percent lower than new gas. Enough to power twelve million homes. And the UK is not stopping at the water’s edge. The government has also proposed removing planning permission requirements for small onshore turbines up to thirty meters tall, no bigger than an oak tree. Farmers. Schools. Factories. All of them able to generate their own clean power on site. No planning application required. Now, let us cross the Atlantic. Off the coast of Rhode Island, the Revolution Wind project is delivering on a promise that once seemed very much in doubt. On March thirteenth of this year, Revolution Wind delivered its first power to the New England grid. The project is led by Ørsted, the Danish offshore wind leader, alongside Skyborn Renewables. As of March sixteenth, the project stood ninety-three percent complete. Sixty-five turbines, each one eleven megawatts, manufactured by Siemens Gamesa. When fully operational, Revolution Wind will power more than three hundred and fifty thousand homes in Rhode Island and Connecticut. Let us go somewhere you might not expect to find wind energy news today. The Philippines. Spanish firm Acciona Energia has installed the first turbine for its Kalayaan 2 wind farm in Laguna province, in the Philippines. One hundred and one megawatts. Seventeen turbines, Goldwind GW 165 units, each one six megawatts, with blades spanning one hundred and sixty-five meters. Every one of them designed specifically to survive typhoons. Structural reinforcement. Smart control algorithms. Advanced sensors to protect infrastructure during storms. Commercial operations are scheduled for December of this year. When that happens, roughly two hundred and fifty thousand tonnes of carbon dioxide will not enter the atmosphere, every single year. And finally, back home in Iowa, a bill is moving through the statehouse that has nothing to do with megawatts. It is about sleep. Iowa House File 2081 would require wind turbines across the state to use aircraft detection lighting systems. Instead of blinking red lights all night long, the lights would only activate when radar detects an approaching aircraft. The bill’s sponsor, Representative Dean Fisher of Montour, put it simply. His constituents used to enjoy a quiet sunset view. Now they stare at rows of flashing red lights through the night. About twenty-seven percent of Iowa’s turbines already have the sensor-based lights. The rest are being upgraded, year by year. The American Clean Power Association registered undecided. New projects, they said, are already planning to use the sensor lights. But retrofitting existing turbines? That cost goes straight to the customer. No groups registered in opposition. Even the environmental advocates said yes. And now you know the rest of the story. From British radar systems finally making room in the sky for offshore wind, to a court-rescued project delivering first power off Rhode Island, to typhoon-proof turbines rising in the Philippines, to an Iowa lawmaker who just wants his neighbors to sleep — wind energy in 2026 keeps moving forward. And that’s the state of the wind industry for the 23rd of March 2026. Join us for the Uptime Wind Energy podcast for more.

Podcast reviews

Read The Uptime Wind Energy Podcast podcast reviews


4.8 out of 5
41 reviews
★★★★★
Fresh Hops 2024/12/04
Informative and witty
I never miss an episode
★★★★★
Itchyfeetpete 2023/09/14
A Constant Favorite
These folks dig into the nitty gritty details of the industry with content coming out several times a week!
★★★★★
Jeremy R Norris 2023/05/04
Uptime = Knowledge
Uptime is a podcast for true Wind Energy knowledge seekers. Wealth of information from true industry experts, very engaging and easy to listen too. Hi...
★★★★★
B. Voter 2023/01/19
Three viewpoints
It's fascinating to recognize so much depth of experience among the three of them. Allen has dates from air flight history and economic data from memo...
★☆☆☆☆
MSPJMG 2023/03/14
False claims are never good for progress.
The a claim made during EP75 - Sr. VP on Chris Howell From Veolia: On Recycling Wind Turbine Blades & A Circular Economy on August 25, 2021 is absolut...
★★★★★
Amatayy 2020/07/04
Great insights!
Fantastic podcast about improving wind farms
★★★★☆
letmerun 2023/01/04
Rosemary is amazing
Rosemary clearly has experience and a great mind. I really appreciate hearing her opinion. Not as impressed with the Americans, but the dialogue is in...
★★★☆☆
race rolland 2021/12/16
I work for the 2nd largest US Wind Generator
This channel has 8 total reviews. Why would you invite an inflammatory Aussie commentator on to discuss what she clearly knows little about... the cha...
check all reviews on apple podcasts

Podcast sponsorship advertising

Start advertising on The Uptime Wind Energy Podcast relevant audience podcasts


What do you want to promote?