1462096731
Company Interviews

Advertise on podcast: Company Interviews

Rating
★★★★★
4.8
from
32 reviews
This podcast has
2000 episodes
Language
English
Publisher
Crux Investor
Explicit
No
Date created
2019/04/30
Latest episode
2026/11/13
Average duration
22 min.
Release period
1 days

Description

An insight into junior mining and opportunities to invest. Company Interviews, a Crux Investor show, exists to cut through the jargon, bias and bluster. Matthew Gordon, and guest host Merlin Marr-Johnson hone in on the important factors that indicate a company's strong footing for growth and success.

Unlock Company Interviews podcast Email contact info,
Listeners & Audience details

Email contact information

Direct podcast contact details

Listeners

Audience numbers & engagement insights

Audience details

Podcast Insights

Podcast episodes

Check latest episodes from Company Interviews podcast


Midterms Priced In, Commodity Views Intact: Post-Election Market Read
2026/11/13
Recording date: 11th November 2026 Olive Resource Capital (TSXV:OC) updates investors on cash deployment after the US midterm elections. Executive Chairman Derek Macpherson and President, CEO and CIO Samuel Pelaez said the fund has deployed only about 5% of a cash balance Macpherson called sizable for this time of year. Most of the capital remains reserved for a seasonal entry point. On the election, Macpherson said Democrats won the House, the Senate and a number of governorships, which he read as a referendum on the cost of living, high prices and elevated diesel costs. Pelaez noted that sitting presidents almost always lose seats at the midterms and that the following six months have tended to be strong for equities. He said most of the outcome appears priced in. Outside crude oil, commodities have been flat, the US dollar remains strong and volatility has been lower than expected. The exception was aggressive selling in AI stocks. That AI selloff carries two commodity read-throughs. First, money rotating out of a large sector typically moves into gold, and the hosts described the rotation as an early positive sign for gold. Second, the copper demand case tied to AI capex looks less certain. Pelaez argued that data center ambitions presented over the past 12 months were hard to realize because projects still need permits, community support and new power plants. On policy, Pelaez expects support for onshoring metals production to continue as a bipartisan priority. He expects it to weaken at the fringes, with less direct government funding of projects and less incentive to maintain aggressive tariffs on specific metals. Macpherson said copper is most exposed. Tariff threats drove a large US inventory build, and a short-term soft spot is possible as it runs down. The copper market remains in a slight supply deficit this year, and he sees no change to long-term fundamentals. The macro view is unchanged. Both parties allow deficit spending. After a hot CPI print, markets are pricing about an 84% to 85% probability of a quarter-point Fed hike, with the policy rate around 3.75% to 4%. Pelaez called the move fully priced in and largely insignificant, with US government bonds yielding about 5%. He focuses on timing instead. The Fed meeting date has historically coincided with the seasonal bottom after third-quarter tax selling and the best entry ahead of the Christmas rally and first quarter, the strongest seasonal period for commodities. A strong US dollar may still produce further washouts first. On oil, peace talks on Ukraine and Iran have pulled prices lower. Both hosts doubt the talks will produce lasting peace. Macpherson said structural demand will keep oil prices up, with a floor a little below current levels rather than a return to pre-war prices. Olive does not wait for macro events before acting, because priced-in outcomes can reverse quickly and unpositioned investors can miss a 5% to 10% move. Management is watching undercapitalized juniors that need to raise funds before year end for specific opportunities. Learn more: https://cruxinvestor.com Sign up for Crux Investor: https://cruxinvestor.com/subscribe
Tectonic Metals (TSXV:TECT) - Funded to Maiden Alaska Gold Resource and PEA Targeted by 2027
2026/11/13
Interview with Tony Reda, President, Founder and CEO of Tectonic Metals Inc. Recording date: 11th November 2026 Tectonic Metals (TSXV:TECT) is advancing the Flat Gold Project in southwestern Alaska toward its first Mineral Resource Estimate (MRE). The company is targeting the maiden MRE for the Chicken Mountain target in Q1 2027 and a Preliminary Economic Assessment (PEA) in Q2 2027 where management is targeting a 5 Moz resource. Co-Founder, President and CEO Tony Reda defines a tier-one mine as 500,000 oz of annual production over a 10-year life, in the lowest cost quartile and a safe jurisdiction. Flat covers 99,840 acres of predominantly Doyon, Limited land. Doyon is one of Alaska’s largest Native regional corporations and has invested more than $10M in Tectonic. Production and impact benefit agreements have been in place since the partnership began in 2018. The district has produced 1.4 Moz of placer gold, the third-highest total of any placer district in Alaska. It sits across a fault from NovaGold’s refractory Donlin deposit, which holds 39 Moz in M&I resources. Drilling at Chicken Mountain has defined 3.3 km of strike, about 700 m wide and 300 m deep, open in all directions. Drilling there has returned gold in all 206 holes to date. Highlights include 9.94 g/t Au over 36.58 m, including 15.73 g/t over 22.86 m, and 8.84 g/t over 13.72 m at the Adit Zone. More than 90% of the mapped monzonite intrusion has not been drilled, and more than 120 holes are awaiting assays from a 33,000 m 2026 program. Metallurgy is the core of the development case. Two columns on 3/4-inch crushed material recovered 96% in 71 days and 91% in 69 days, with no separation of oxide from fresh rock. Reda attributes this to a low-sulfur, fracture-controlled system, which cyanide can reach easily. Tectonic reports low cyanide consumption, no agglomeration requirement and no preg-robbing. Reda said crushing and grinding typically make up about 50% of AISC, so a coarse crush supports a low-cost operation at an off-grid site. Another 15 columns, run under chilled conditions, are due before year-end 2026. Black Creek, 6 km north, is an emerging second gold center. 17 of 18 holes have hit gold from 1,600 m of drilling, including 4.50 g/t over 48.77 m and 5.61 g/t over 41.15 m. The host is hornfels, different from the monzonite at Chicken Mountain. Metallurgical samples were collected in 2026, and step-out drilling is planned for 2027. The balance sheet supports the plan. Tectonic held $83.2M in cash at June 30, 2026, has no debt, and 55% of its shares are held by institutions, including VanEck, Franklin Templeton and Crescat. Management is weighing an 80/20 or 70/30 split between conversion and expansion drilling, depending on the share price at the next raise. Learn more: https://www.cruxinvestor.com/companies/tectonic-metals Sign up for Crux Investor: https://cruxinvestor.com/subscribe
Americas Gold and Silver (TSX:USA) - Record Quarter Funds Higher-Grade Silver-Copper Push
2026/11/13
Interview with Oliver Turner, Executive Vice President of Corporate Development of Americas Gold and Silver  Our previous interview: https://www.cruxinvestor.com/posts/americas-gold-silver-tsxusa-doubles-galena-hoisting-as-mexico-drilling-widens-the-upside-12052 Recording date: 11th November 2026 Americas Gold and Silver (TSX:USA) is running a two-asset funding model. Cosalá in Sinaloa, Mexico, generates cash, and the company is spending it on a sequenced rebuild of the Galena Complex in Idaho’s Silver Valley. Executive Vice President of Corporate Development Oliver Turner set out the plan following a record third quarter. Consolidated silver production reached 800,458 oz in the third quarter of 2026, with Cosalá at 415,879 oz and Galena at 384,579 oz. Year-to-date output is 2.3 Moz against 2026 guidance of 3.2 to 3.6 Moz at AISC of US$30-35/oz. Turner said the fourth quarter must be bigger than the third for the company to reach the low end of guidance, and that it is on track. First-half AISC was US$36.92/oz, above the guidance range. Available liquidity was US$113M at September 30, 2026, including US$63M of cash and US$50M undrawn on the SAF credit facility. At Cosalá, mining moved in 2026 from the zinc-dominant San Rafael zone into the EC120 orebody, which has a 7-year mine life under the current preliminary economic assessment. Turner said grades are running above 125 g/t Ag against a modeled average of just over 100 g/t, and drilling returned 20.5 m at 654.7 g/t Ag and 1.5% Cu just outside the 2025 Inferred boundary. The company plans to update the EC120 numbers next year. At Galena, the team used time studies that follow one ton of rock from face to mill. The first round identified hoisting and the mining method as the primary bottlenecks. The No. 3 Shaft skipping rate rose from 40 to 105 tph, hoisting is targeted at 1,350 stpd, and the mine is shifting from underhand cut and fill to long hole stoping toward a 70/30 split. Turner said 23 long hole stopes have been mined to design limits. Secondary fixes followed: four new grizzlies cut tram loading from 5 minutes to 20 seconds per 4-ton car, fiber optics now run through the mine, and Turner cited a 30% improvement in breaking rock at the face. The next phase targets grade as well as tonnage. Galena’s silver-copper ore carries roughly 2 times the silver grade of its silver-lead ore, and reaching it requires waste development. Turner said the mine had about a month of waste development ahead of mining when the team arrived, against a rule of thumb of about 2 years. The paste fill plant is due for completion in the first quarter of 2027, the company is validating dry stack tailings, and the mill is targeted to rise from about 750 to 1,200 stpd. Crescent, 9 miles away, will feed the Galena mill once a secondary egress is connected, and the presentation describes potential for about 1.5 Moz/yr. Turner described a first target of 5 Moz/yr at Galena, with engineering for a larger complex running well into 2027. Learn more: https://www.cruxinvestor.com/companies/americas-gold-silver-corporation Sign up for Crux Investor: https://cruxinvestor.com/subscribe
Santacruz Silver (TSX:SCZ) - Bolivar Back on Track, Zimapan Gains Set Up 2027 Growth
2026/11/12
Interview with Arturo Préstamo Elizondo, Executive Chairman & CEO, Santacruz Silver Our previous interview: https://www.cruxinvestor.com/posts/santacruz-silver-mining-tsxscz-cash-growth-production-increase-more-acquisitions-under-review-12122 Recording date: 11th November 2026 Santacruz Silver Mining (TSX:SCZ) is a multi-asset silver-zinc producer with four producing mines in Bolivia and Mexico, the San Lucas ore-sourcing business, and the Soracaya development asset. Executive Chairman and CEO Arturo Préstamo Elizondo said the company spent 2026 preparing its operations to run efficiently whatever metal prices do. He is targeting growth of at least 20% in 2027, measured in profitable ounces. The price backdrop explains the focus. Silver price fell from $84.39/oz in Q1 2026 to $62.73/oz in Q3. Zinc price rose from $3,243/t to $3,830/t over the same period. Santacruz drew 53.2% of H1 2026 revenue from silver and 40.3% from zinc. Préstamo Elizondo said he is bullish on both metals but sees some cost inflation across the industry. After the May 2025 water inflow, dewatering ran on time and on budget, and Bolivar is back on track in Q4. Q3 silver output was 408,087 oz, up 19% QoQ and 209% YoY. Head grade rose to 186 g/t from 165 g/t. Two high-grade silver blocks are targeted for production in mid-to-late Q1 2027. Santacruz invested a little more than $15M at its Mexican Zimapan mine over 15 months, after encouraging results at level 960, and is targeting payback within 1.5 years. The program raises head grades, adds roughly 6,000 t of monthly throughput on a 74,000 t base, and improves recoveries. Management is targeting an 8% to 10% production increase. Silver recovery rose from 72% to 76% in Q3, lifting silver output 3% on flat throughput. Mine life is more than 8 years, and a first-time Zimapan resource report is due with updated estimates across all mines. For inventory policy, geology must replace at least 1.3x the tonnage mining depletes, and each mine aims to hold at least 5 years of mine life ahead. Prepared areas give management flexibility if costs squeeze margins. Exploration capex can flex, but infill drilling is not cut. San Lucas Q3 throughput fell 19% to 92,921 t because company mines used more mill capacity. The release also cites lower purchased-ore grades. A newly acquired 500 tpd mill dedicated to San Lucas is targeted for commissioning in Q4 2026, with management targeting another 10% growth next year. Santacruz H1 2026 revenue was $241M (+68%) and adjusted EBITDA $89M (+64%). Realized silver averaged $76.33/oz against AISC of $25.34/oz. Cash and liquid securities were $73M at June 30. Préstamo Elizondo said treasury was around $130M at the end of Q3, with no streams or royalties. The company has identified a few acquisition opportunities and will only pursue conservative, accretive deals, as with Zimapan and the Glencore Bolivian assets. View Santacrux Silver's company profile: https://www.cruxinvestor.com/companies/santacruz-silver-mining Sign up for Crux Investor: https://cruxinvestor.com/subscribe
New Found Gold (TSX:NFGC) - Q3 Operating & Financial Results
2026/11/12
Interview with Keith Boyle, Director & CEO of New Found Gold Our previous interview: https://www.cruxinvestor.com/posts/new-found-gold-tsxnfgc-queensway-pea-mre-update-12474 Recording date: 11th November 2026 New Found Gold has completed its first quarter of commercial production at the Hammerdown Gold Mine in Newfoundland and Labrador, producing 4,863 ounces of gold at 2.77 g/t with zero lost-time incidents. The company sold 6,935 ounces at an average realized price of US$4,285 per ounce, generating C$41.6 million in revenue and C$11.2 million in operating cash flow before working capital changes. Income from mine operations reached C$18.6 million, or 45% of revenue. All-in sustaining costs of US$3,279 per ounce came in US$904 above the Hammerdown PEA. CEO Keith Boyle attributed the gap mainly to three ramp-up items. Stripping in the Rumbullion pit, brought forward from early 2027 to avoid winter conditions, added about US$350 per ounce. An 11% lower head grade added about US$135 per ounce, and infill drilling to upgrade Inferred resources added further cost. Management is targeting a life-of-mine AISC of around US$2,500 per ounce. Three projects support that target: grade control drilling, a crusher and ore sorter due for commissioning in early 2027, and the conversion of the Pine Cove Mill to a gravity-CIL circuit. At the flagship Queensway Gold Project, the revised PEA outlines an after-tax NPV5% of C$1.728 billion and a 126% IRR at US$3,600 gold, with a Phase 1 head grade of 13.41 g/t. The Phase 1 Environmental Preview Report was registered on November 3, 2026, and Boyle expects a ministerial decision by year-end or early in the first quarter of 2027. The roughly C$150 million Phase 1 build is backed by C$167.1 million in cash, a further C$35 million of available debt and expected warrant proceeds. Management says the build is fully funded, including under a stress test at US$3,500 gold. Hammerdown cash flow is earmarked for G&A and exploration. The teams and processes built at Hammerdown are being transferred to Queensway ahead of first delivery to Pine Cove, targeted for Q4 2027. — Learn more: https://cruxinvestor.com/companies/new-found-gold Sign up for Crux Investor: https://cruxinvestor.com/subscribe
Lahontan Gold (TSXV:LG) - Targets Q4 2027 First Gold Pour at US$820M NPV Santa Fe
2026/11/12
Interview with Kimberly Ann, President, Founder, CEO of Executive Chair of Lahontan Gold Recording date: 10th November 2026 Lahontan Gold Corp. (TSXV: LG) is advancing a restart of the Santa Fe Mine in Nevada’s Walker Lane. Santa Fe is a past producer that yielded over 359,200 oz gold and 702,000 oz silver between 1988 and 1995 through open-pit mining and heap leaching. Founder and CEO Kimberly Ann argued that the October 2026 PEA gives a deliberately conservative picture of the asset. The PEA base case uses US$3,600/oz gold and US$49/oz silver. It returns an after-tax NPV5% of US$820.0M and an IRR of 40.1% on initial capital of US$172.0M, including a US$22.2M contingency. Cash costs are US$1,909/oz and AISC is US$2,250/oz. The 11-year mine life averages 91,900 AuEq oz a year, rising to about 112,500 oz in years 4 to 11 after throughput expands from 12,500 tpd to 17,000 tpd. At October 13 spot prices of US$4,166 gold and US$59 silver, NPV5% reaches US$1.13 billion and IRR 50.4%. The central debate is the early schedule. Output in years 1 to 3 is lower, and the PEA payback is 3.68 years. Ann says about 200,000 oz on historic heap leach pads, already crushed, are not yet included because assays are pending. She estimates handling at about $5 a ton, with recrushing to improve permeability. First sonic results from 10 holes on Heap Leach Pad Two averaged 0.50 g/t Au and 3.3 g/t Ag, with a 40% average cyanide gold response. Ann says that once pad material is front-loaded, the company models payback near 22 months. That figure is not yet in a published study. A second source of legacy material is now under test. Lahontan outlined up to 100 RC holes averaging about 35 m into the Santa Fe East waste rock facility. The facility holds roughly 9.0 Mt mined between 1988 and 1992 under a 0.55 g/t cut-off, and the PEA already moves it as stripping. Ann said historic low-grade stockpiles have also returned assays above 1 g/t. On the path to production, the PEA completes the mine permit application. Ann is targeting permits around Q2 2027 and, with a contract miner committed to a six-month build, a first pour in Q4 2027. The company’s own illustrative roadmap shows first gold in 2028. Lahontan has NDAs with several debt providers and is targeting 80% debt and 20% equity. It is not pursuing a stream, and Santa Fe carries only a 1.25% royalty on 24 patented claims. Growth sits at West Santa Fe, 13 km away. 2025 drilling there returned 36.6 m at 3.11 g/t AuEq from surface, with 81% Au and 60% Ag cyanide-extractable recoveries, and a maiden resource is targeted for early 2027. The pending Emergent Metals acquisition would deliver 100% ownership, remove US$1.73M in payments, cancel 1% NSRs and add New York Canyon. Pad and waste rock assays, the Emergent vote and the permit decision are the next catalysts. Learn more: https://www.cruxinvestor.com/companies/lahontan-gold Sign up for Crux Investor: https://cruxinvestor.com/subscribe
Cabral Gold (TSXV:CBR) - Commercial Production Weeks Away, Resource Update by Year-End
2026/11/11
Interview with Alan Carter, President and CEO of Cabral Gold Our previous interview: https://www.cruxinvestor.com/posts/cabral-gold-tsxvcbr-november-commercial-production-eyes-doubling-output-12183 Recording date: 9th November 2026 Cabral Gold (TSXV:CBR) has completed construction of its Phase 1 heap leach mine at the Cuiú Cuiú gold district in Pará State, Brazil, and is targeting a commercial production declaration before the end of 2026. The PFS scheduled a 12-month build, and Cabral finished in 10 months and on budget. A first gold pour of 1,130 oz was announced on September 10, 2026, and ramp-up ran through October and November. Phase 1 mines oxide material within 60 m of surface: soils, sediments and saprolite that need no drilling, blasting, crushing or grinding. The plant is designed for 3,000 tonnes per day. The July 2025 PFS by Ausenco Brazil targets 25,000 oz per year in the first 2 years at cash costs of US$950/oz, with an AISC of US$1,210/oz over the life of mine. Management is targeting 25,000 to 30,000 oz in the first year. The central change is funding. Cabral previously paid for drilling with equity raises, which diluted shareholders across a district with more than 50 untested targets. President and CEO Alan Carter said Phase 1 cash flow will more than cover exploration costs. Cabral is not anticipating further dilution, and Carter defined growth as market capitalization, value per share and share price. As of November 6, 2026, Cabral held C$68M in cash, and its market capitalization was C$448.4M. A US$45M gold loan funded construction. Principal repayments of 39 kg of gold per quarter begin on March 31, 2027. The larger prize is the hard rock. About 75% of the current resource of 670,480 oz Indicated and 527,320 oz Inferred is hard rock. Each of the 6 deposits is open at depth, and several are open along strike. Carter described central high-grade zones inside lower-grade stockwork halos. At Jerimum Cima, drilling returned 9.5 m at 87.4 g/t Au within a high-grade zone about 400 m long. Cabral is targeting a PEA on the Phase 2 hard rock mine in the third quarter of 2027, followed by infill drilling and a Phase 2 PFS in the fourth quarter. Carter expects Phase 2 capital to be much larger than Phase 1’s US$37.7M. The resource update targeted for the end of 2026 covers 6 deposits, against 3 in 2022, after about 50,000 m of drilling. Management’s target is above 2 Moz. Cabral has made 4 hard rock discoveries since 2022. Results outside the deposits include 27 m at 6.9 g/t at Central SE and boulders averaging 91.7 g/t at Alonso.  Cuiú Cuiú lies on the same fault structure as G Mining Ventures’ Tocantinzinho, which produced 177,000 oz in 2025, and Carter was part of Tocantinzinho’s early discovery. Cuiú Cuiú produced an estimated 2 Moz of placer gold, 10 times Tocantinzinho’s total. Catalysts include the commercial production declaration, the year-end resource update, Phase 1 expansion details, the Phase 2 PEA, and Phase 1 cost control as loan repayments begin.  Learn more: https://www.cruxinvestor.com/companies/cabral-gold Sign up for Crux Investor: https://cruxinvestor.com/subscribe
TriStar Gold (TSXV:TSG) - Brazil Court Ruling Puts 1.4Moz Project Back on Feasibility Track
2026/11/11
Interview with Nick Appleyard, President & CEO of TriStar Gold Inc. Our previous interview: https://www.cruxinvestor.com/posts/tristar-gold-tsxvtsg-603m-npv-80-peer-discount-gold-developer-awaits-court-ruling-11482 Recording date: 9th November 2026 TriStar Gold (TSXV:TSG) has moved from a binary legal outcome to a defined permitting process at its 100%-owned Castelo de Sonhos gold project in Pará State, Brazil. The Federal Court of Pará issued an interim ruling in the civil public action brought by Brazil’s Federal Prosecutor’s Office in August 2025. The court provisionally suspended the effects of the project’s preliminary environmental license (LP) but did not cancel it. It directed the company to complete an Indigenous Component Study (ECI) and a free, prior and informed consultation (FPIC) before construction or operating licenses can be issued. The ruling expressly permits technical studies, environmental work and administrative activities to continue. CEO Nick Appleyard said the company can carry out all of its drilling, technical and environmental work. He plans to run the ECI in parallel with the feasibility study because the study is likely to produce information the consultation will need. TriStar had been pressing Brazilian authorities to begin the consultation for the past year. Within 60 business days of formal notification, SEMAS and TriStar must file additional technical documents and evidence of progress. Appleyard estimates this window closes around March 2027 and sees it as pressure on FUNAI, the federal Indigenous agency, to issue terms of reference. He estimates 4 to 6 months of study work and 12 to 18 months from start to finish, with FUNAI more likely than the communities to set the pace. Once FUNAI accepts the ECI as complete, he said the court filing would take weeks. The project is based on a May 2025 PFS: 1.4Moz of probable reserves at 1.1 g/t Au, after-tax NPV5% of US$603M and 40% IRR at US$2,200/oz gold, initial capex of US$296M including 20% contingency, AISC of US$1,111/oz and a 2-year payback. Production averages 121koz/yr over 11 years, with about 146koz/yr from Esperança South in years 1 to 6. At US$3,200/oz, NPV5% rises to US$1.3B and IRR to 72%. The feasibility study is targeted to take about 2 years, subject to financing. Appleyard pointed to Esperança South extensions at 1.3 to 1.5 g/t and a tailings disposal trade-off as the work streams most likely to move the economics. At C$0.225 per share on October 7, 2026, the market capitalization was C$91.0M. The company’s peer comparison shows TriStar at 0.02x P/NAV against a 0.3x median, the lowest of 12 peers, and US$20 per M&I ounce against a US$94 median. The next watch-items are the 60-business-day filing, FUNAI’s terms of reference, 2027 extension drilling and the tailings trade-off.  TriStar holds just under US$10M in cash, and Appleyard said warrants could add about $5M by May 2027. That covers 2027 drilling, infill drilling, the start of trade-off studies and the ECI, but not the full 2-year program, so further financing will be needed. View TriStar Gold's company profile: https://www.cruxinvestor.com/companies/tristar-gold-inc Sign up for Crux Investor: https://cruxinvestor.com/subscribe
Contango Silver & Gold (TSX:CTGO) - $150M Free Cash Flow as Three Projects Advance
2026/11/11
Interview with Rick Van Nieuwenhuyse, Director & CEO of Contango Silver & Gold Our previous interview: https://www.cruxinvestor.com/posts/contango-silver-gold-tsxctgo-direct-shipping-cash-flow-funds-path-to-200kozyear-gold-plan-12186 Recording date: 9th November 2026 Contango Silver & Gold is a gold producer with a growth pipeline across Alaska and British Columbia. Its cash comes from a 30% interest in the Manh Choh mine, which Kinross operates and owns 70% of. Manh Choh uses a direct shipping ore (DSO) model: ore is trucked about 240 miles to Kinross’s Fort Knox mill, so Contango did not build a mill or tailings facility. In 2025, Contango’s share was 59,500 oz of gold, and it received a $102 million distribution. CEO Rick Van Nieuwenhuyse restated the five-year target of 200,000 oz of gold and 5 Moz of silver a year. Each asset funds the next. Manh Choh funds Lucky Shot, and the two together fund Johnson Tract and Kitsault Valley to production decisions. Manh Choh is weaker in 2026. Production will be near the low end of the 40,000 to 45,000 oz guidance after heavy September rain paused Fort Knox’s heap leach. The remaining ore moves into the fourth processing campaign, starting in November. Costs are higher because all-sulfide ore uses more cyanide and lime, and diesel and salaries have risen. Published 2027 guidance is 75,000 to 80,000 oz at $1,200 to $1,300 per oz. Van Nieuwenhuyse gave a lower preliminary figure of about 70,000 oz and around $150 million in free cash flow to Contango, with formal guidance due in December. He put remaining mine life at this year plus three more. Lucky Shot is 100% owned and fully permitted. It holds about 110,000 oz at 14.5 g/t gold. Drilling runs into February 2027, an MRE is targeted for May 2027, and a tolling-based feasibility study follows, most likely using Fort Knox. The company is targeting 40,000 to 50,000 oz a year from 2028, at cash costs near $2,000 per oz at $4,000 gold. Drilling in the 2070 East and 2300 East drifts is testing the vein system’s eastern extent for the first time in the modern era. The larger growth comes from two polymetallic deposits. Johnson Tract holds about 1.1 Moz at 9.4 g/t AuEq. Its May 2025 Initial Assessment estimated a post-tax NPV5% of $615.4 million and an IRR above 60% at $4,000 gold. Road and port permits are targeted for May 2028 and production for 2030. Kitsault’s September 2026 MRE reported 89.5 Moz AgEq Indicated at 363 g/t and 64.92 Moz AgEq Inferred at 320 g/t. It excludes the 56,492 m drilled in 2026, which will feed an update in the first half of 2027 and an Initial Assessment later that year. Both deposits need a sulfide mill. Contango is choosing between buying an idle mill and building on a permitted site near Kitsault, and Van Nieuwenhuyse said this will need some equity. Contango had $89 million in cash at June 2026, against $45.3 million of bank debt and a $20 million convertible. It has no hedges and about 33 million shares outstanding, which management wants to keep low. Catalysts to watch are 2027 guidance in December, the Lucky Shot MRE in May 2027, the Kitsault update in the first half of 2027, and the processing decision. View Contango Silver & Gold's company profile: https://www.cruxinvestor.com/companies/contango-silver-gold-inc Sign up for Crux Investor: https://cruxinvestor.com/subscribe
Excellon Resources (TSXV:EXN) - First Mallay Silver Revenue, Targets 600 tpd by Mid-2027
2026/11/11
Interview with Shawn Howarth, President & CEO of Excellon Resources Our previous interview: https://www.cruxinvestor.com/posts/excellon-resources-tsxvexn-mallay-restarts-as-drilling-supports-resource-depth-12149 Recording date: 9th November 2026 Excellon Resources (TSXV:EXN) is restarting the past-producing Mallay silver-lead-zinc mine in central Peru. The company is presenting the asset as a near-term revenue source that can fund district-scale exploration. President and CEO Shawn Howarth said 2026 established the operating base and 2027 is about converting it into cash flow. Excellon reopened the Mallay underground in early 2026 and published an NI 43-101 MRE in February 2026: 12.01 Moz AgEq Indicated at 420 g/t AgEq and 4.00 Moz AgEq Inferred at 344 g/t AgEq. Three pre-commissioning milling campaigns processed 19,884 t, recovered 52,860 oz Ag in concentrate at recoveries of 84% Ag, 84% Pb and 81% Zn, and generated US$4.4M in revenue from Glencore under the offtake. Howarth said the campaigns effectively de-risked the surface infrastructure. About 9,000 m of a 10,000 m infill and step-out program is complete, and the 400 Ramp has been dewatered. A new mining contractor has been engaged. Management is targeting a consistent 300 tpd through Q1 and Q2 2027 and 600 tpd, the mill’s rated capacity, by mid-2027. At full rate, Howarth cited roughly 2 Moz AgEq a year based on historical production, stressing it is not guidance. Mining is shifting from historical 1-1.5 m narrow veins to replacement-style zones of 3-4 m (potentially up to 5 m), mined with trackless, mechanized equipment. The 400 Ramp is the access route below the 4090 Level. Howarth said its rehab is on schedule for year-end, targeting completion in Q1 2027. An updated MRE and SRK mine plan, targeted for YE 2026, will gate Clavo 3 and Clavo 6 production. Cash was US$5M at the October 29 update, alongside an undrawn US$5M Glencore credit facility. Contingency levers include strategic options for Kilgore (Idaho), a possible Silver City (Germany) spin-out, and potential Glencore credit extensions. The Adar base metals stream amendment defers remaining Pb/Zn deliveries to January 2031, pending TSXV approval. The stated objective is a self-funding model in which free cash flow from Mallay pays for deeper development and exploration. The first DHEM hole (~800 m) hit skarn-style alteration from ~600 m with anomalous copper, 300-400 m below the current epithermal veins; a second hole is underway. Tres Cerros, 6 km west, hosts a 2.5 km intermediate-sulfidation epithermal trend with 7 targets. An initial 5,000 m program focused on 2-3 priority targets is targeted for H1 2027, subject to permits, with DIA submission targeted for YE 2026. View Excellon Resources' company profile: https://www.cruxinvestor.com/companies/excellon-resources-inc Sign up for Crux Investor: https://cruxinvestor.com/subscribe
Banyan Gold (TSXV:BYN) - Fully Funded to 2028, Maiden AurMac PEA Targeted for Q4 2026
2026/11/10
Interview with Tara Christie, President & CEO of Banyan Gold Corp. Our previous interview: https://www.cruxinvestor.com/posts/banyan-gold-tsxvbyn-franco-nevada-backs-aurmac-gold-project-ahead-of-pea-12106 Recording date: 9th November 2026 Banyan Gold is preparing a maiden Preliminary Economic Assessment (PEA) for its AurMac gold project in Canada’s Yukon with a treasury of about C$100M, enough to fund its programs through 2028. AurMac hosts a pit-constrained resource of 3.64 Moz Indicated at 0.68 g/t Au and 4.98 Moz Inferred at 0.58 g/t Au. The site already has roads, hydro power and cell phone coverage. The PEA is targeted for the fourth quarter of 2026. President and CEO Tara Christie said the company will not release it over the Christmas holidays, so it could move into early 2027 if the work is not finished. The study uses drilling to the end of 2025. The most important ground for the next study is the gap between the Airstrip and Powerline deposits, a roughly 500 m wide and 1.5 km long which counts as waste in the current resource model and the PEA as it was undrilled. Christie said it falls within the first 10 years of a potential mine plan and could become a new starter pit. An earlier hole returned 13.03 g/t Au over 14.2 m, including 142.70 g/t over 1.0 m. A hole reported four zones, including 1.34 g/t over 20.2 m and 1.18 g/t over 27.5 m. About 20,000 m of drilling is still needed in the gap, most of it once the ground freezes from January. Banyan has drilled 90% of its 70,000m 2026 program and plans to restart on January 4. The 2027 plan calls for about 100,000 m at AurMac and 20,000 to 30,000 m at Nitra. Banyan intends to cut off data after about the first 3 months of 2027, with assays around June or July. Christie expects the resulting resource update to exceed 10 Moz. The next study is expected in late 2027 or early 2028 and will more likely be a prefeasibility study than an updated PEA. Funding came from a C$54.3M financing at C$2.00 per share that closed on September 29, 2026. Franco-Nevada was lead order and bought 10 million shares, adding to the AurMac royalty it acquired in February. The deal carried no warrants. Christie said dilution was less than 5% and the raise saved about a year on the timeline. Shares traded near C$1.60 at the time of the interview, and Christie said she put about C$500,000 into the round. Christie said the PEA is written for the Yukon government, regulators and communities as well as investors. She expects a mine life of more than 25 years and is keeping options open on scale, processing and grid power, with the Whitehorse power center set to add 160 MW. At Nitra, Banyan made discoveries at Seattle Creek and Roaring Fork, with assays for 18 more holes pending. View Banyan Gold's company profile: https://www.cruxinvestor.com/companies/banyan-gold-inc Sign up for Crux Investor: https://cruxinvestor.com/subscribe
Silver Crown Royalties (SLCRF) - Signs Producing Colombia Royalty After Profitable Q3
2026/11/09
Interview with Peter Bures, Chairman & CEO of Silver Crown Royalties Our previous interview: https://www.cruxinvestor.com/posts/silver-crown-royalties-slcrf-silver-pure-play-royalty-unlocking-unreported-ounces-12426 Recording date: 6th November 2026 Silver Crown Royalties Inc. (CBOE:SCRI, OTCQX:SLCRF) builds a silver-only royalty portfolio by buying byproduct silver from gold and copper operators, with the stated objective of becoming a dividend-paying company tied to the silver price. Two announcements in quick succession have reshaped its outlook. The company reported third quarter results showing royalty revenue of C$1.61 million, up 541% year on year, and net income of over C$379,000 for its second consecutive profitable quarter. Attributable deliveries were 18,063 ounces (oz), unchanged from the second quarter, while revenue fell 14% quarter on quarter on a lower average silver price. The balance sheet showed C$7.72 million in cash and term deposits, C$15.49 million in working capital and no debt. Silver Crown announced a definitive agreement, dated October 31, to acquire a royalty on 90% of payable silver from Soma Gold’s El Bagre Gold Mining Complex in Antioquia, Colombia, for US$10 million in cash. The structure pays Silver Crown the greater of 90% of payable silver until 305,500 oz are delivered, after which a 7.5% silver net smelter return (NSR) royalty applies for the life of the operation. US$3 million is due at closing, targeted by November 30, 2026, and US$7 million follows once Soma’s existing gold financier releases its security and Silver Crown registers first-ranking security. If that discharge is not completed by December 31, 2026, Silver Crown can require Soma to buy back the royalty for US$3 million plus interest. The company is targeting a roughly 29% increase in attributable silver ounce revenue in 2027 and 57% in 2028 from the deal. Chairman and Chief Executive Officer Peter Bures states the  current annualized run rate is about 75,000 oz from PPX Mining’s Igor 4 project in Peru and Pilar Gold’s recently restarted PGDM complex in Brazil. Further upside comes from three 1% NSR royalties on Titiminas Silver’s Madre Sierra deposit in Peru, where the operator is targeting a 2027 restart and 2.5 million to 3.5 million silver-equivalent oz a year by 2029. Bures said 25,000 to 30,000 oz is plausible at the small-scale stage. The Elk Gold and Scotia mine royalties are excluded from management’s figures. Valuation is the main debate. Silver Crown trades at about 53 times trailing twelve-month sales and 38 times annualized third quarter sales on a C$243 million market capitalization, against 25 to 35 times for royalty peers under $1 billion. Risks include closing conditions and the security discharge at El Bagre, operator credit, and silver price exposure. For investors, the near-term tests are the El Bagre first-tranche closing by November 30, 2026, the security registration targeted by December 31, 2026, and the Madre Sierra restart in 2027. View Silver Crown's company profile: https://www.cruxinvestor.com/companies/silver-crown-royalties Sign up for Crux Investor: https://cruxinvestor.com/subscribe
F3 Uranium (TSXV:FUU) - Drill Expansion with Second Rig as Assays Pending at Tetra Discovery
2026/11/09
Interview with Ross McElroy, Director & CEO of F3 Uranium Our previous interview: https://www.cruxinvestor.com/posts/f3-uranium-tsxvfuu-lines-up-drilling-exploration-catalysts-under-new-leadership-12242 Recording date: 6th November 2026 F3 Uranium Corp. has expanded its fall drilling at the Patterson Lake North (PLN) Project in Saskatchewan’s western Athabasca Basin after a step-out hole about 1 km east of the Tetra Zone discovery returned new radioactivity. One hole intersected 5 discrete intervals of anomalous radioactivity, each 0.5 m to 1.0 m wide, between 352.0 m and 649.5 m downhole in strongly altered basement rock. The peak of 4,400 cps, recorded from 610.5 m to 611.0 m, is the highest handheld reading F3 has logged in an exploration hole on PLN outside the JR and Tetra zones. Assays are pending. The hole tested up-dip of an earlier step-out that had shown encouraging alteration without radioactivity. CEO Ross McElroy said the follow-up confirmed the same alteration and structural preparation and added radioactivity. He is not expecting high grade, offering a loose estimate of around 0.25% U3O8, and F3’s release cautions that handheld readings do not reliably correlate with assay grades. Two other holes, about 1.3 km southeast and 1.6 km south of Tetra, hit strong alteration but no radioactivity above 300 cps. The approximately 3,350 m winter program around Tetra returned one reportable interval of 0.5 m at 0.06% U3O8. F3 has added a second rig dedicated to the new area through the December freeze-up, while the first rig tests regional targets. The summer and fall program started at about 4,000 m in roughly half a dozen holes and is now targeting about 5,500 m to 6,000 m, with crews returning by mid-January. McElroy said the direction of the controlling structure can only be found by drilling, and that continued spending depends on hole-by-hole improvement. Results will shape the 2027 program. Geologically, McElroy expects any mineralization east of Tetra to be a separate occurrence on a shared east-west corridor. Tetra itself turned out to have east-west controls despite north-south conductors, and conductors farther east in the Broach area also run east-west. He pointed to the Carter corridor, which hosts the Lightning occurrence outside F3’s ground, as a possible link. F3 held about $16.8 million in cash on November 3, 2026, against a market capitalization of about $70 million. Flow-through funds must be spent by the end of 2027, and McElroy is looking at a minimum of about $8 million in 2027 ground spending. Denison Mines’ $15 million convertible debenture carries a 9% quarterly coupon, convertible at $0.56. McElroy expects to keep paying about a third of interest in shares. The JR Zone holds 11.8 Mlb of Indicated U3O8 at 4.41%, including 10.8 Mlb at 12.23%. McElroy said PLN needs about 2 to 3 times that scale, roughly 30 Mlb or more, and sees JR as potential satellite feed for mills NexGen and Paladin are expected to build in the early 2030s. Watch items include the step-out assays, second-rig results through mid-December, the January restart, and the consolidation. View F3 Uranium's company profile: https://www.cruxinvestor.com/companies/f3-uranium-corp Sign up for Crux Investor: https://cruxinvestor.com/subscribe
Pacifica Silver (CSE:PSIL) - Advancing the Claudia Silver-Gold Project Towards 2027 Maiden Resource
2026/11/06
Interview with Todd Anthony, Director & CEO of Pacifica Silver Recording date: 4th November 2026 Pacifica Silver Corp. is an exploration company drilling the 100%-owned Claudia Silver-Gold Project in Durango State, Mexico. The 11,876-hectare property covers most of the historic El Papantón Mining District and holds more than 30 km of known veins. CEO Todd Anthony said only about 10% of those veins had been drill-tested before Pacifica’s work began. Anthony spent 2010 to 2023 at First Majestic Silver, and he said that experience shaped which Mexican states he was willing to work in. The company took over the project in July 2025 and drilled 7,992 m in 29 holes that year. Its fully funded Phase II program began in mid-January 2026, was expanded to 30,000 m, and had reached over 27,900 m in 118 holes by October 26, with 4 rigs operating. Anthony said roughly 75% to 80% of this year’s holes have tested the Aguilareña Vein, the site of a 94 m historical shaft. Results released raised mineralized strike across the Aguilareña, Central and Justina veins to more than 3.9 km, an increase of about 1.4 km, or 56%. A step-out about 500 m south on the Central Vein returned 8.72 g/t Au and 49 g/t Ag over an estimated true width of 5.04 m, including 35.83 g/t Au and 159 g/t Ag over 1.03 m. The company reports an emerging shoot of about 750 m of strike and 100 m down-dip, open along strike and at depth. Aguilareña now measures about 2.7 km of strike and 225 m down-dip, although grades on the new southern extension are lower than in the shoot north of the shaft. Anthony’s investment case starts with near-surface grade and low costs. He put all-in drilling at about $140 per meter, and the project lies about 15 km by paved road from Santiago Papasquiaro, so crews can stay in town. Durango ranks 4th most peaceful of 32 Mexican states in the 2026 Mexico Peace Index, and the company cites drill permits in roughly 45 days. The mining method is undecided, with a small pit and ramp-accessed underground mine under discussion, and metallurgical testing is still to come. Pacifica is targeting a maiden resource in 2027. Anthony said between 60,000 m and 70,000 m of drilling will feed it, with an internal cut-off under consideration for the end of the first quarter of 2027. Most of the estimate is planned to come from Aguilareña, with contributions from Central and Justina. A first drill test at Lizeth, a 250 m wide zone in the north, is targeted for the same quarter, and a hit could delay the resource so that Lizeth can be included. Anthony put the market capitalization at about $75 million and cash at about $20 million at the time of the interview, while the October presentation shows C$61 million at October 15 and C$26.9 million in cash at March 31. Staged payments to Silverstone begin at US$7 million if a Measured and Indicated resource is disclosed. Pacifica must also drill at least 50,000 m and publish a technical report disclosing Measured or Indicated resources by December 31, 2029, or the project returns to Silverstone unless the premium is renegotiated. Claudia has no current mineral resource, and the company describes the investment as highly speculative. Sign up for Crux Investor: https://cruxinvestor.com/subscribe
Global Atomic (TSX:GLO) - Conditional US$414M DFC Approval & 2028 Shipment Target
2026/11/05
Interview with Stephen G. Roman, President & CEO of Global Atomic Corp. Our previous interview: https://www.cruxinvestor.com/posts/global-atomic-tsxglo-africas-highest-grade-uranium-mine-could-match-all-us-production-7873 Recording date: 4th November 2026 Global Atomic is building the Dasa uranium mine in Niger, which is described as the highest-grade uranium mine in Africa. The company owns 80% through SOMIDA, and the Niger Government holds 20%. The largest change in the story is financing. On September 16, 2026, the DFC board approved a debt facility of up to US$414.2M, made up of a term loan of up to US$397.4M and a US$16.8M cost overrun facility. Roman said the process took 4 years. The approval does not close the loan, and drawdown remains subject to conditions. Roman names 3 conditions. The first and probably most important is an export port, and he said US embassies in Benin, Nigeria and Algeria are working on a route. The second matches the mining permit term to the DFC loan, which was extended from 7 to 10 years, while Niger’s permits typically renew every 5 years. Roman said Niger has agreed to a 10-year rollover. The third is a government-to-government agreement between the US and Niger. Costs have reset. Direct project costs are US$653.0M and total project costs are US$777.6M. Roman attributes the increase mainly to time, saying each year of border closures and logistics issues cost US$100M, or US$300M over 3 years, and puts the capital estimate about 70% above the original. The company is reviewing the numbers for its third-quarter report. On site, about 830 people are working. Underground development is down 4 levels, with 1 more in the first phase, and water inflows and rock quality are better than planned. A pilot plant is being shipped to site for operator training. Roman is targeting plant completion by the end of 2027 and shipments in the second half of 2028. The presentation estimates about 20 months of plant construction once financing is available, and first drawdowns are targeted for the second quarter of 2027, so those dates need to be read together. Dasa’s 2024 Feasibility Study shows 68.1 Mlb U3O8 over 23 years at 4,113 ppm, with a target of about 4 Mlb a year at 1,000 tpd. After-tax NPV8% is US$917M at US$75/lb and US$1,621M at US$105/lb, on a 100% basis and before the cost update. Contracts are now around US$100/lb, according to management. Market capitalization was C$199M at C$0.33 on October 31, 2026. Roman reports at least half a dozen utilities calling for supply since the DFC news. View Global Atomic's company profile: https://www.cruxinvestor.com/companies/global-atomic-corp Sign up for Crux Investor: https://cruxinvestor.com/subscribe

Podcast reviews

Read Company Interviews podcast reviews


4.8 out of 5
32 reviews
★★★★★
Gnutimes 2021/12/21
Under the radar, mineral mining companies
Crux Investor features in-depth interviews with exploration company execs. They tend to be under the radar, with potential. One Summer 2021 example: ...
★★★★★
usafc 2021/12/19
WM
Keep up Good Work . On these interviews.
★★★★★
malfoxley 2021/05/21
Great show!
Matthew, host of the Crux Investor podcast, highlights all aspects of mining opportunities and more in this can’t miss podcast! The host and expert g...
★★★★★
TribeTillInfinity 2020/08/25
Perfect for New Investors
I’ve only been learning about the commodity space for 6 months and there is a lot to take it. The valuation model is much different then your typical ...
★★★★★
GT198515 2020/05/25
Must listen!
Matthew is an excellent interviewer with a knack for getting people to open up. I love how he seeks to understand his interviewees as well as the co...
★★★★★
WillisThomas 2019/06/19
Well done
Smooth, informative interviews with real insight
check all reviews on apple podcasts

Podcast sponsorship advertising

Start advertising on Company Interviews relevant audience podcasts


What do you want to promote?