1617658793
datacenterHawk

Advertise on podcast: datacenterHawk

Rating
★★★★★
5
from
1 reviews
Categories
Country
United States
This podcast has
284 episodes
Language
English
Explicit
No
Date created
2022/04/04
Latest episode
2026/10/13
Average duration
25 min.
Release period
15 days

Description

Helping people make the best data center decisions possible.

Unlock datacenterHawk podcast Email contact info,
Listeners & Audience details

Email contact information

Direct podcast contact details

Listeners

Audience numbers & engagement insights

Audience details

Podcast Insights

Podcast episodes

Check latest episodes from datacenterHawk podcast


Data Center Vietnam: From 15kW Racks to 100kW Requests
2026/10/13
Tammy and May of STT GDC Vietnam on what changed inside a Ho Chi Minh City data center in one year: racks from 15kW to 30kW, 100kW liquid-cooled requests, and deals that now run on import law. Why Vietnam isn't short of power, why it needs a one-stop investment agency, and when its first hyperscale project could break ground. Hosted by datacenterHawk's Arvinth S. 📊 Get more market insights HERE 🤝 Speak with someone from our global data team HERE 💻 Book a platform demo HERE
Data Center Power: India's 6-Cent Electricity Edge
2026/08/26
Ankit Saraiya, Director & CEO of Techno Digital Infra Pvt. Ltd., on why power - not silicon - is India's real AI-infrastructure advantage: sourcing electricity near six cents, running Chennai on 98% renewables, a 102-city edge network on railway fiber, and why he says India has "no global match." Hosted by datacenterHawk's Dedi Iskandar. 📊 Get more market insights HERE🤝 Speak with someone from our global data team HERE 💻 Book a platform demo HERE
1H 2026 Market Breakdown
2026/08/18
Mike Netzer and David Liggitt on the first half of 2026: 13.2GW leased in the US against 15.6GW for all of 2025, 1GW asks becoming 4GW asks, Europe's first multi-100MW quarter, 2GW leased across APAC, and why signed deals don't always get built. A global midyear market update from datacenterHawk. 📊 Get more market insights HERE🤝 Speak with someone from our global data team HERE💻 Book a platform demo HERE
Data Center Demand: Built in Months, Not Years
2026/08/13
Ronald Setiawan, Director of Operations at IndoData Data Centres, on the move to full Salim ownership: why local speed beats a two-year build, why he built south of Jakarta for cheaper power, why he's an operator who won't sell, and the ~2,000MW waiting in Bintan & Batam. 📊 Get more market insights HERE🤝 Speak with someone from our global data team HERE💻 Book a platform demo HERE
Data Center Strategy: Build for Everyone, Not One Tenant
2026/08/11
Luke McKinnon, SVP & MD Asia at NextDC, on the strategy behind KL1 - Peninsular Malaysia's first Tier IV data center: why building for every segment beats single-tenant, why retail yields 3–4x hyperscale, the neo cloud “20MW in three months” problem, and a 150MW KL2. Recorded at DCD Connect APAC, Bali. Hosted by datacenterHawk.
Data Center Scale: When 1 Megawatt Was a Big Deal
2026/08/05
Chris Han, COO of MC Digital Realty (the Digital Realty x Mitsubishi JV) and head of Digital Realty Korea, on how AI is reshaping APAC data centers: why the "Asia follows the US" playbook broke, steel plants becoming data center sites, a 64MW Korea build, liquid cooling as the new default, and Japan's long runway. 📊 Get more market insights HERE 🤝 Speak with someone from our global data team HERE 💻 Book a platform demo HERE
Data Center Growth: Aragon Is Overtaking Madrid
2026/07/21
Alejandro Fuster, Secretary General of the Spanish Data Center Association, on why Spain is one of Europe's hottest data center markets: 439MW operational at end-2025, Aragon set to overtake Madrid by 2030, a new grid law reshaping the pipeline, a ~55% renewable mix, and what the public actually worries about. 📊 Get more market insights HERE🤝 Speak with someone from our global data team HERE💻 Book a platform demo HERE
Data Center Delivery: From Contract to Go-Live in 8 Months
2026/07/06
Nick Ning, VP of Data Center Solutions at Bridge Data Centres, on building AI capacity across APAC: delivering a live data center in 8 months instead of 18–24, why a gigawatt campus uses water equal to 50,000 households, how BDC runs 90MW of liquid and 10MW of immersion cooling, and why global demand doubles to 200GW by 2030. 📊 Get more market insights HERE🤝 Speak with someone from our global data team HERE💻 Book a platform demo HERE
Data Center Growth Shifts to Asia's Power-Surplus Markets
2026/06/17
Mayank Srivastava, CEO of BDx Data Centres, on building AI infrastructure across Southeast Asia: over 1 GW of power secured in Indonesia on signed PPAs, a 20-year-old Singapore site cut from a 1.65 to 1.35 PUE, why talent is the next constraint, and why he warns of "digital colonization" without sovereign AI. 📊 Get more market insights HERE🤝 Speak with someone from our global data team HERE 💻 Book a platform demo HERE
Data Centers in Latin America: A $250B Build-Out Begins
2026/06/15
Tito Costa, CRO of Tecto, on why Brazil's data center market is about to shift. 60% of enterprise workloads are processed outside the country. Tecto is deploying $2B across five new facilities, including a 200MW AI factory in São Paulo. Plus: Porto Alegre as a Southern Cone gateway, tax reform, and why $250B of opportunity turns competitors into collaborators. 📊 Get more market insights HERE 🤝 Speak with someone from our global data team HERE 💻 Book a platform demo HERE
Data Center Growth Shifts South: Why Northern Mexico Is the Next Overflow Market
2026/06/10
Juan Salazar, CEO of MDC Data Centers, explains how 6 border sites and International Fiber Crossings reshaped US-Mexico interconnection. LATAM holds only ~2.5% of 87GW global capacity. Cross-border traffic grows 30% YoY. Plus: MDC's cable landing hubs in Cancun and Veracruz for the Manta consortium, delivering summer 2027. 📊 Get more market insights HERE 🤝 Speak with someone from our global data team HERE 💻 Book a platform demo HERE
Data Center Growth Shifts to APAC: Why Australia Is Next
2026/06/02
Nauman Akhtar, Co-CEO of Insite DC, explains how a new Australasia-focused operator is building for the AI-driven data center wave. Backed by Halcyon Capital, Insite DC targets Melbourne and Sydney with bespoke, speed-to-market solutions. Plus: why they serve both Western and Eastern hyperscalers, and their JV strategy for Japan, Indonesia, and Singapore. 📊 Get more market insights HERE 🤝 Speak with someone from our global data team HERE 💻 Book a platform demo HERE
Data Center Adaptive Reuse: From Printing Press to 50MW AI Facility in 90 Days
2026/05/05
Patmos CEO John Johnson has never raised outside capital. His model: convert urban industrial buildings into AI data centers in 90 days. The company turned a 400,000 sq ft Kansas City printing press into a live training facility for Nebius and secured a $100M PACE loan to finance it. Johnson shares why the greenfield window is closed and which operators survive consolidation. 📊 Get more market insights HERE🤝 Speak with someone from our global data team HERE💻 Book a platform demo HERE
Poland's Data Center Boom: 3.2GW, Below-€10M Builds, and Europe's Largest Energy Construction Site
2026/04/28
📊 Get more market insights HERE🤝 Speak with someone from our global data team HERE💻 Book a platform demo HERE Poland is now Europe's largest energy construction site, with 38GW of renewables installed and a grid preparing for 5GW of data center capacity by 2040. Piotr Kowalski of the Polish Data Center Association breaks down what's driving the boom: below-€10M/MW builds, 50% lower cooling costs, and gigawatt-scale projects from the Baltic coast to Western Pomerania.
$1.5 Billion in 12 Months: Equinix's Unprecedented Brazil Expansion (Em português)
2026/03/25
📊 Get more market insights HERE🤝 Speak with someone from our global data team HERE💻 Book a platform demo HERE (Em português) A Equinix investiu mais de US$3 bilhões no Brasil e está executando 4 obras simultaneamente, incluindo uma instalação focada em IA. Victor, Presidente da Equinix Brasil, detalha os R$1,5 bilhão investidos em 12 meses, por que a reforma tributária sozinha não vai impedir que 60% das cargas de trabalho sejam processadas fora do país, e como a primeira nuvem de IA do Brasil triplicou sua capacidade em 6 meses. Equinix has invested $3B+ in Brazil and is running 4 builds at once, including an AI-focused facility. Victor, President of Equinix Brazil, breaks down the R$1.5B spent in 12 months, why tax reform alone won't stop 60% of workloads from going offshore, and how Brazil's first AI cloud tripled capacity in 6 months.

Podcast reviews

Read datacenterHawk podcast reviews


5 out of 5
1 reviews

Podcast sponsorship advertising

Start advertising on datacenterHawk relevant audience podcasts


What do you want to promote?